Similar Projects
Spring Creek Park Subdivision
New Construction
Conception
Kalispell, MT 59901

Green Acre Storage Units
New Construction
Conception
Missoula, MT

Bitterroot Heights Subdivision
New Construction
Design
Billings, MT 59105

Mountain View
New Construction
Design
Kalispell, MT 59901

Pompeys Pillar National Monument Stabilization
Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
Pompeys Pillar, MT

Access Renovations for Parking Lots L & K
Infrastructure
Bidding
$500,000 CJ est. value
Fort Harrison, MT 59636

Bitterroot River - 3m S Hamilton
Infrastructure
Sub-Bidding
$6,000,000 CJ est. value
Hamilton, MT 59840

Montana Museum of Arts Culture Building Site Work Project
Infrastructure
Post-Bid
Missoula, MT 59812

Lone Peak High School - Phase 2 Addition And Renovation - Bid Package #2
Renovation, Term Contract, Infrastructure, Alteration
Post-Bid
Gallatin Gateway, MT

Groundwater Wells
Infrastructure
Results
$277,200 est. value
Helena, MT 59602

Executive Residence Renovations - Phase 1
Renovation
Results
Helena, MT 59601

Holbrook Estates
New Construction
Conception
Kalispell, MT

Garnier Heights
New Construction - 6,238,400 SF
Design
Columbia Falls, MT 59912

Wilsall Water District Water System Improvements
New Construction, Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Wilsall, MT 59086

Park Restroom
Renovation, Infrastructure
Post-Bid
Roundup, MT 59072

Last Updated 07/26/2022 12:06 PM
Project Title

General Contract 2022 Tribal ARP Homes

Physical Address View project details and contacts
City, State (County) Box Elder, MT 59521   (Hill County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Chippewa Cree Housing Authority (hereinafter *the Housing Authority*) will receive one total bid for the Labor and Materials to build 3 homes on the Rocky Boy's Indian Reservation. SCOPE OF WORK: Homes will be "STICK BUILT" to plans and specifications provided by the Chippewa Cree Housing Authority. Each proposal will include all labor, materials, equipment, and incidentals to complete job. 1. Project Name 2. Bidder Name and Address 3. Item Being Proposed 4. TERO: Full compliance with Tribal Employment Rights Ordinance and Business code is mandatory. T.E.R.O. has established a 3% business tax. The Chippewa Cree Tribe also has a 2% business admin fee for all work done within the exterior boundaries of the reservation. Both fees must be included in proposals. MINIMUM WAGES: Attention is called to the fact that not less than the minimum Davis-Bacon salaries and wages as set forth in the Contract Documents must be paid on the project. Special attention is called to the fact that any State, Local, or Tribal wage rates that exceeds the corresponding federal rate is inapplicable and shall not be enforced. INDIAN PREFERENCE: It has been determined that this project is subject to Section 7(b) of the Indian Self Determination and Education Assistance Act and CCHA Procurement requirements. 5. Bids are invited from non-Indian as well as qualified Indianowned Economic enterprises or organizations. INSURANCE: All contractors/SubContractors shall provide the following; 6. Bonding 7. Workers Compensation 8. General Liability Insurance 9. RIGHT TO REJECT ANY AND ALL PROPOSALS: This Advertisement for Proposals does not commit the Housing Authority to award a contract nor to pay any costs incurred in the preparation of proposal(s) or to procure supplies. The Housing Authority reserves the right to reject any and all proposals, to waive any formalities and irregularities and to re-advertise when it is in the best interest of the Housing Authority. For more information contact: Justin Four Colors - planning@ cciha.org Aaron Henry - ahenry@cciha.org

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents