Similar Projects
Water Meter Replacement
Infrastructure
Design
$83,850 CJ est. value
Porterdale, GA 30014

Expand Terminal Apron Vidalia Regional Airport
Infrastructure
Bidding
$800,000 CJ est. value
Vidalia, GA 30474

Blue Jay Road Water Line Extension Loop B Construction
Infrastructure - 36,000 SF
Bidding
$200,000 CJ est. value
Guyton, GA 31312

Plumbing Services for DeKalb Cares
Term Contract
Sub-Bidding
Decatur, GA 30030

Unpaved Roads - Phase 1, Braeburn Drive, Hirsh Street
Infrastructure
Post-Bid
$1,890,079 CJ est. value
Atlanta, GA 30334

Plumbing Service and Repair for Fire Department
Alteration
Post-Bid
Augusta, GA

Purchase Bottle Filler Station and ADA Cooler
Alteration
Results
Marietta, GA

Plumbing Services
Alteration
Results
Decatur, GA 30030

Cowan's Lake Raw Water Pump Station Improvements
Renovation
Pending Verification
$86,000 CJ est. value
Villa Rica, GA 30180

Stormwater Improvements - Hunter Road, Forest Lane and Morgan Road
Infrastructure
Bidding
$200,000 CJ est. value
Union City, GA 30291

KSU - Plumbing Maintenance, Repair, and Installation Services
Alteration
Post-Bid
Kennesaw, GA

PVC Schedule 40 DWV Pipe
Term Contract
Results
GA

Plumbing Services 2021
Alteration
Post-Bid
Warner Robins, GA

Citywide Plumbing Repairs and Maintenance Service
Term Contract
Results
Atlanta, GA

Georgia Weatherization Assistance Program
Alteration
Post-Bid
Jasper, GA

Last Updated 04/02/2023 04:32 PM
Project Title

Water Distribution System Improvements Phase I

Physical Address View project details and contacts
City, State (County) Hoschton, GA 30548   (Jackson County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,071,178 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of, but is not limited to the following major elements: Installation of approximately 5,440 LF of 12-inch waterline, 205 LF of jack and bores, abandonment of existing waterlines, reconnection to existing waterlines, meter reconnections and relocations, fire hydrants, valves and associated appurtenances. If a bidder is not selected within sixty (60) days of the bid opening, any bidder that is determined by the OWNER to be unlikely of being selected for contract award shall be released from their bid. All bids will be evaluated by OWNER and the project will be awarded, if it is awarded, within sixty (60) days of the bid opening. The award of this bid proposal, if awarded, shall be based on several criteria, including prices bid, experience in the work proposed, and references. Refer to Article 14 of Section 00100 for criteria and award method.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents