Similar Projects
Evans West
New Construction, Demolition - 715,000 SF
Conception
$160,000,000 est. value
Denver, CO 80204

Re-Design Swim and Fitness Center
Renovation, Addition, Alteration
Conception
Westminster, CO 80030

Design Build Services for Stadium and Pool
Design
Colorado Springs, CO

Thompson Thrift Multi-Family Residential Development
New Construction, Infrastructure - 1,111,044 SF
Design
Monument, CO 80132

Willow Bend Community
New Construction
Post-Bid
Fort Lupton, CO 80621

Swimming Pool Replaster
Infrastructure
Post-Bid
Centennial, CO 80015

5 New Flow Through Outdoor Soaking Pools
Results
Salida, CO 81201

2020 Outdoor Pool Replaster
Results
Sterling, CO 80751

Lodge at Black Forest Phase ll
New Construction - 375,358 SF
Construction
$10,000,000 est. value
Colorado Springs, CO 80908

Apex Meridian Phase II
New Construction - 180,000 SF
Construction
$10,000,000 est. value
Lone Tree, CO

UCCS Main Pool Plaster Resurfacing
Infrastructure
Post-Bid
Colorado Springs, CO

Arbaney Pool Facility Upgrade
Results
Less than $3,300,000 est. value
Basalt, CO 81621

Farm Haus / Brick Stone Apartments
New Construction - 391,874 SF
Construction
$68,800,000 est. value
Longmont, CO

Recreation Center-Leisure Pool Leak Detection/ Repairs and Pool Re-Plaster
Infrastructure
Post-Bid
Longmont, CO 80501

Outdoor Pool Services
Results
Thornton, CO 80229

Last Updated 05/11/2022 04:24 AM
Project Title

Discovery Bay - Shell Repair, Replaster and Shell Deck Drain Repairs

Physical Address View project details and contacts
City, State (County) Greeley, CO 80631   (Weld County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Clean, environmentally safe 40,000 psi Ultra High Pressure Water Jetting to remove loose, hollow or deteriorated sub-surface materials in order to insure the best possible mechanical bond. Cutting and removing the existing plaster down at least 2” away from the waterline tiling, inlets, lights and other fixtures to achieve a flush finish with the new surface. High-pressure water blasting (3500 psi) to completely clean the prepared surface. Placing contrasting color highlight tiles to demark the edges of all the steps and benches, and to satisfy applicable local codes. Re-plastering of the pool shell using Diamond Brite plaster. The repair or replacement of main drain covers, inlet fittings, and other fixtures including deck drains in accordance the Virginia Graeme Baker Act.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents