Similar Projects
U.S.Postal Service Driftwood TX, MPO Building/Parking Expansion
Infrastructure
Bidding
$750,000 to $1,000,000 est. value
Driftwood, TX 78619

Kissing Tree West Centerpoint Road - Phase 2B
Infrastructure
Post-Bid
San Marcos, TX 78666

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

San Marcos Parking Lot
Results
$73,975 est. value
San Marcos, TX 78666

Meadow Lake Boulevard Street Extension
Infrastructure
Results
$2,480,000 est. value
Austin, TX 78744

Oak Drive Parking Improvements
Infrastructure
Post-Bid
Wimberley, TX 78676

Violet Trail Crown - North Phase 2A
Infrastructure
Results
$1,500,000 est. value
Austin, TX

Construction of Kissing Tree West Centerpoint Road Phase 3A
Infrastructure
Post-Bid
San Marcos, TX 78666

Prairie Lakes Phase 1 Section 1
Infrastructure
Results
TX

Plum Creek Section 10-1 - Water, Wastewater, Drainage, and Paving Facilities
Infrastructure
Post-Bid
TX

Brush Square - Phase 1 Implementation
Infrastructure
Results
$2,200,000 est. value
Austin, TX

Construct Pedestrian Infrastructure
Infrastructure
Post-Bid
$732,745 est. value
Uhland, TX

Lazy Nine MUD 1B, Sweetwater Section 2, Village M and Q
Infrastructure
Results
Austin, TX

VA - State Park Improvements
Infrastructure
Results
$346,135 est. value
TX

Ranch House Road Phase 1 and DSRP Restriping
Infrastructure
Results
$299,080 est. value
Dripping Springs, TX 78620

Reported 06/22/2022 10:01 AM
Project Title

A New Accessible Entrance Ramp / San Marcos Treatment Center

Physical Address View project details and contacts
City, State (County) San Marcos, TX 78666   (Hays County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Bids by Invitation.
Project Status Construction Documents, Construction Start Expected August 2022, Construction Completion Expected August 2024
Bids Due View project details and contacts
Estimated Value $50,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of a medical facility in San Marcos, Texas. Working plans call for the renovation of a 150-square-foot medical facility. A new accessible entrance ramp. As of June 21, 2022, no applications have been submitted for building permits. An architect has been selected; however, a general contractor or selection method is not disclosed. Although a firm timeline cannot currently be established, construction is not expected to commence prior to third quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents