Similar Projects
Last Updated | 09/15/2021 10:56 AM |
Project Title | Battle Park Site Work and Demolition |
Physical Address | View project details and contacts |
City, State (County) | Rocky Mount, NC (Edgecombe County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Demolition, Site Development |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $91,500 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The removal process will include ALL debris from each lot i.e., all structures, sidewalk / concrete, rock associated with previous construction, asphalt, and landscape timbers. The demolition area will be raked clear/smooth of ALL debris before seeding. The Contractor shall backfill and compact all excavated areas with sand-clay and dress off and fill in all low spots with topsoil in order to provide positive drainage within the limits of the work area and shall grade, reseed, and straw the demolition area and any other areas disturbed during completion of the work. Reseeding is to be done with Kentucky Fescue grass seed or other native ground cover that would be typically found within Battle Park area. (The result of this effort will create an area that can easily be maintained with park maintenance equipment.) |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |