Similar Projects
Franklin Middle School - Fairfax County Public Schools
Renovation
Conception
$90,000,000 CJ est. value
Chantilly, VA 20151

Twain Middle School - Fairfax County Public Schools
Renovation
Conception
$90,000,000 CJ est. value
Alexandria, VA 22310

Centreville High School - Fairfax County
Renovation - 410,000 SF
Design
$158,000,000 CJ est. value
Clifton, VA 20124

Haycock Row Mixed-Use Development
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Falls Church, VA 22042

Sandburg Middle School Science Lab Project
Renovation
Post-Bid
$390,000 est. value
Alexandria, VA 22308

Original Mount Vernon High School
Renovation
Post-Bid
$81,000,000 CJ est. value
Alexandria, VA 22309

Renovation Project Falls Church High School
New Construction, Renovation, Demolition - 475,993 SF
Results
Less than $100,000,000 est. value
Falls Church, VA 22042

Gymnasium Divider Curtain Replacements
Renovation
Results
$74,600 CJ est. value
Fairfax, VA 22032

The Madeira School
New Construction - 36,540 SF
Construction
$10,000,000 CJ est. value
McLean, VA 22102

Garfield Memorial Christian Church / New Principal Building - McLean
New Construction, Renovation, Infrastructure
Pending Verification
$900,000 CJ est. value
McLean, VA 22101

Centreville High School - Fairfax County
Renovation - 410,000 SF
Design
$138,454,000 CJ est. value
Clifton, VA 20124

McLean High School Group Bathroom Upgrades
Renovation
Post-Bid
$100,000 CJ est. value
McLean, VA 22101

Folding Divider Wall Replacement at Mount Vernon High School
Renovation
Results
$128,877 CJ est. value
Alexandria, VA 22309

Whitman Middle School Group Bathroom Upgrades
Renovation
Post-Bid
$109,000 CJ est. value
Alexandria, VA 22306

Security Vestibules Phase 1 Bid Package 2
Renovation
Post-Bid
$907,000 CJ est. value
Falls Church, VA 22042

Last Updated 08/29/2023 02:06 PM
Project Title

Emergency Generator Replacement at Poe Middle School

Physical Address View project details and contacts
City, State (County) Annandale, VA 22003   (Fairfax County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Emergency Generator Replacement at Poe Middle School Liquidated damages in the amount of $500.00 per calendar day will be imposed if job is not completed by the specified date. Should you have any questions concerning type of extent of work required, you may contact Chris Hutzell at (571) 294-8932 or Angela Mylechraine at (703) 764-2457. Any question or request for an interpretation must be in writing and submitted to the Owner by U.S. Mail, commercially recognized overnight delivery service, or hand delivery during business hours addressed as follows: Angela C. Mylechraine, CPPB, VCO, Contract Administrator Fairfax County Public Schools Department of Facilities and Transportation Services Office of Facilities Management 5025 Sideburn Road, Room 16 Fairfax, Virginia 22032 Telephone Number: (703) 764-2457 Email: acmylechrain@fcps.edu Question Deadline 08/26/2023 It is the intent of this Contract to secure services to remove the existing 45KW exterior Natural gas generator, with the associated automatic transfer switch from Washington Irving Middle School. The new 45KW Natural gas generator will be installed on original concrete pad inside the fenced Chiller area. The natural gas fuel supply line and conduits for the feeders and control wires shall be installed as described in these specifications. A. The Contractor shall install the new 125-amp ATS in the electrical room on strut at the previous switch location. Modification to be made to existing conduits to accommodate installation of new transfer switch. B. The Contractor shall reuse all #3 THWN feeder and load conductors for the new transfer switch, but may need to extend conductors, if necessary, for proper installation. Copper compression splices with heavy duty heat shrink shall be used on any extensions. C. The #3 THWN feeders and 120volt circuit for battery charger and block heater and control wiring located at original generator pad shall be re-used if of adequate length to install new generator on existing pad. D. Replace original annunciator on top of ATS with new Cummins Power Command annunciator. Replace wiring/cabling with proper size and type from generator to new annunciator as required by Cummins. E. The Contractor shall reuse the existing pipeline and eight #14 THHN signaling wires in the transfer switch to the pull box over the transfer switch for the run/fault and security relays. Disconnection and re-instillation may need to be coordinated with FCPS Fire alarm Technician. F. Contractor shall use existing gas line and make all necessary modifications for proper installation with all new Ball gas valve, Regulator and external solenoid in coordination with local and IFGC codes. G. If the current generator becomes inoperable, the Contractor shall furnish and install a backup temporary generator with cabling, control wires to the school emergency electrical system while the generator project is in transition. The temporary generator and cabling will be removed upon project completion. All temporary building penetrations shall be repaired by the Contractor. The area around the portable and existing generator shall be enclosed in a temporary fence. H. The Contractor shall ensure all applicable NEC an IPC codes will be followed. I. It is the intention of these Specifications to call for finished work, tested and ready for operation. J. Any apparatus, appliances, materials, or work not indicated but mentioned in these Specifications, or vice versa, or any incidental accessories necessary to make the work complete and perfect in all respects and ready for operation, even if not particularly specified, shall be furnished, delivered, and installed by this Contractor at no additional expense to the Owner. K. Minor details not usually shown or specified, but necessary for the proper installation and operation shall be included the same as if herein specified. L. With submission of bid, this Contractor shall give written notice to the Owner of any materials or apparatus believed: inadequate or unsuitable; in violation of federal, state, and local laws, codes, and ordinances, including Fairfax County's electrical inspection rules or regulations; and any necessary items of the work which have been omitted. In the absence of such written notice, it shall be mutually agreed that the Contractor has included the cost of all required items in the proposal and that the Contractor shall be responsible for the approved satisfactory functioning of the entire electrical system and low voltage electrical systems at no additional expense to the Owner.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents