Similar Projects
Replace Pump Station and Drain field
Term Contract
Design
$250,000 to $500,000 est. value
Wisdom, MT 59761

Install Dewatering System at Lf D-2 Synopsis
Term Contract
Design
Malmstrom AFB, MT

Two new wells at the new West Reserve Drive Well Site
Infrastructure
Bidding
Kalispell, MT 59901

MBMG Blackfeet Well Drilling
Infrastructure
Post-Bid
Butte, MT

Beaverhead Deerlodge National Forest - Flint Creek Campground Well Drilling
Term Contract
Post-Bid
Philipsburg, MT 59858

Groundwater Wells
Infrastructure
Results
$277,200 est. value
Helena, MT 59602

Kalispell Upper Zone Wells Project
Alteration
Results
$578,250 est. value
Kalispell, MT

New Wellhouse and Mainline Construction Project
Alteration
Post-Bid
MT

Municipal Groundwater Test Wells Project
Infrastructure
Results
Bozeman, MT 59715

Leon Johnson Hall Redundant Heat Pump Module Installation
Renovation, Infrastructure
Post-Bid
Bozeman, MT 59717

Construction of the East Helena Water Source Improvements 2022
Infrastructure
Results
East Helena, MT

Lone Pine State Park Water System Improvements
Infrastructure
Post-Bid
$145,200 est. value
Kalispell, MT 59901

Opheim Mainline Project Schedule 4 - Pump Station and GSR
Infrastructure
Results
$3,900,000 est. value
Opheim, MT

Falcon Hollow Well - 2
Infrastructure
Post-Bid
Bozeman, MT

Kalispell Wells Project
Infrastructure
Post-Bid
Kalispell, MT

Reported 03/31/2022 12:00 AM
Project Title

Region 7 Latrine Pumping

Physical Address View project details and contacts
City, State (County) Helena, MT   (Lewis and Clark County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To pump twenty-two sealed vault latrines on an as needed basis for FWP's Region 7 State Parks, and Fishing Access Sites (FAS), including the Glendive Rifle Range, through 2027

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents