US 71: Bridges Near St. Maurice
Demolition, New Construction, Infrastructure
Design
$15,000,000 CJ est. value
Campti, LA 71411

LA 120: Sabine Parish Line to LA 6
Infrastructure
Design
$5,000,000 CJ est. value
Robeline, LA 71469

Poland Floating Dock and Comfort Station
Infrastructure
Bidding
$1,671,000 CJ est. value
Natchitoches, LA 71457

Henry Road Safety Widening: LA 73 To Tillotson and Aikens Road Clearing and Grubbing
Infrastructure, Alteration
Post-Bid
$350,000 to $500,000 est. value

Lift Stations Backflow Preventative Maintenance Service
Renovation, Infrastructure
Post-Bid
Reserve, LA

Lee Street Lift Station Improvements
Renovation
Results

Water Distribution and Production System Improvements; Powhatan Connection (Contract I, Water Well)
Infrastructure
Results
$370,693 CJ est. value
Natchitoches, LA 71457

LA 119: Realign At Magnolia Plantation
Infrastructure
Design
$5,000,000 CJ est. value
Cloutierville, LA 71416

Replacement of John S. Kyser Hall, Northwestern State University
New Construction, Infrastructure - 73,200 SF
Post-Bid
$30,340,000 CJ est. value
Natchitoches, LA 71457

LA 1: LA 1-x to LA 6
Infrastructure
Design
$2,500,000 CJ est. value
Natchitoches, LA 71457

A New Technology Center for Natchitoches Parish School Board
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Natchitoches, LA 71457

LA 6: US 171 to Natchitoches P.L.
Infrastructure
Design
$7,500,000 CJ est. value
Robeline, LA 71469

LA 6 : Install U-Turn Lanes West Of I-49
Infrastructure
Design
$5,000,000 CJ est. value
Natchitoches, LA 71457

LA 1222: LA 485 - Mallard Bayou Br
Infrastructure
Design
$2,500,000 CJ est. value
Natchitoches, LA 71457

LA 1-x: Keyser Ave to Church St
Infrastructure
Design
$250,000 CJ est. value
Natchitoches, LA 71457

Last Updated 12/02/2022 12:52 AM
Project Title

Melrose and Upstream Lift Station Upgrades (D2-3) Sewer Capital Improvement Program

Physical Address View project details and contacts
City, State (County) Natchez, LA 71456   (Natchitoches County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $858,985 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Project Consists of the Construction of a Submersible Duplex Sewerage Lift Station (D2-3), Melrose & Upstream Lift Station. Installation of New 6" Sewer Force Main to Tie Into Existing Sewer Force Main. Installation of New 12" Gravity Sewer, Abandonment of Gravity Sewer, and Abandonment of Existing Pumping Chamber. Each Bid must be accompanied by an electronic bid surety bond in the amount equal to five percent (5%) of the total amount bid, and payable without condition to the owner. Vendors must submit an electronic bid bond through the respective online clearinghouse bond management system(s) as indicated in the electronic bid solicitation on Central Auction House. No scanned paper copies of any bid bond will be accepted as part of the electronic bid submission. The successful bidder will be required to furnish a performance bond guaranteeing faithful performance of the contract. Companies providing the bonds shall comply with the requirements of LA-R.S. 38:2218 and R.S. 38:2219 as applicable. Deposit on the first set of documents furnished bona fide prime bidders will be fully refunded upon return of documents in good condition no later than ten (10) days after receipts of bids. The Jefferson Parish Council reserves the right to reject all bids and to reject bids for just cause, pursuant to the law. Jefferson Parish and its partners as the recipients of federal funds are fully committed to awarding a contract(s) to firm(s) that will provide high quality services and that are dedicated to diversity and to containing costs. Thus, Jefferson Parish strongly encourages the involvement of minority and/or woman-owned business enterprises (DBE's, including MBE's, WBE's and SBE's) to stimulate participation in procurement and assistance programs. However, failure to attend the pre-bid conference shall not relieve the bidder of responsibility for information discussed at the conference. Furthermore, failure to attend the prebid conference and inspection does not relieve the successful bidder from the necessity of furnishing materials or performing any work that may be required to complete the work in accordance with the specification with no additional cost to the owner.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans