Similar Projects
HVAC Rooftop and Ceiling Mounted HVAC Units
Term Contract
Sub-Bidding
Boston, MA 02118

Roof Exhaust Fan
Term Contract
Sub-Bidding
Boston, MA 02203

HVAC and Mechanical Products
Term Contract
Post-Bid

Revere Police Station Cooling Tower Replacement
Alteration
Post-Bid
$180,000 est. value
Revere, MA 02151

Rooftop Air Conditioning Units
Results
Boston, MA

HVAC and R Maintenance Contract- Eastern Massachusetts
Results
$3,000,000 est. value

Heating Program 2022-2024
Term Contract, Renovation, Infrastructure
Pending Verification
Boston, MA 02203

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Maintenance, Repair and Service of the Distribution Control Systems
Alteration
Results
Less than $400,000 est. value
East Boston, MA

HVAC Upgrades
Alteration
Post-Bid
Less than $70,000 est. value
Boston, MA 02111

HVAC
Alteration
Results
Boston, MA

HVAC Maintenance Services at Match Community Day
Term Contract
Post-Bid
Boston, MA 02136

EAHU 1&2 Fan Retrofit and Multi-Stack Chiller Replace
Term Contract
Results
$500,000 to $1,000,000 est. value
Boston, MA 02111

Mechanical Services, Three Years, DMH Northeast Area
Term Contract
Post-Bid
$120,000 est. value

Rooftop Air Handling Unit
Alteration
Results
Boston, MA

Last Updated 09/26/2022 05:01 AM
Project Title

Wachusett Dam Lower Gatehouse Pipe and Boiler Replacement

Physical Address View project details and contacts
City, State (County) Boston, MA 02203   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Q And A Open: 09/02/2022 12:30:01 AM Q And A Close: 09/10/2022 02:30:00 AM The work includes, but is not limited to, the following: furnishing all labor, materials and equipment to demolish existing piping in Well No. 2, 3 and 4, modifications to existing pipe layout, installation of new isolation and flow control valves, including electrical/instrumentation; improvements to the fountain line, installation of a new access platform, boiler replacement, and hazardous material abatement at the Wachusett Dam Lower Gatehouse.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents