Project Title | Peele-Dixie W. T. P Chemical Tank Replacements and Degasifier Improvements |
Physical Address | View project details and contacts |
City, State (County) | Fort Lauderdale, FL (Broward County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Fuel/Chemical Tanks and Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,400,000 |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is located at 1500 South State Road 7, in the City of Fort Lauderdale. The work to be accomplished under this contract includes: the furnishing of all labor, equipment, and materials for removal and replacement of three, 11,500 gallon and one 950 gallon fiberglass sodium hypochlorite storage tanks and removal, disposal and replacement of degasifier media and installation of a degasifier media cleaning system. This project includes procurement, construction, testing, and placing in service, the equipment and materials.All materials, components and chemicals in contact with water in the treatment process must be NSF approved or Food Grade. In general terms, this project includes the following project elements covered by these Contract Documents: Relocate an exhaust fan, interior lights, conduits, wiring and supports out of the way of the work, Remove and dispose of existing removable concrete block wall panel measuring approximately 14 feet by 14 feet, Install a bifold door across the wall panel opening, Remove and dispose of existing chemical bulk storage and day tanks, including piping to the transfer pumps, Remove and replace the coating in the containment area for the sodium hypochlorite tanks, Install new chemical bulk storage and day tanks with all piping, connect to the transfer pumps, and provide startup services, Remove and dispose of the piping for the City ’ s existing temporary sodium hypochlorite system, including wall brackets and supports, Restore the south wall of the chemical building, including repair of damage resulting from the work, patching penetrations and holes resulting from removal of the temporary hypochlorite piping, checking the entire surface of the south wall for areas of delaminated stucco, replacing areas of delaminated stucco and painting the entire exterior south wall of the chemical building, Remove and replace degasifier media from two degasifiers, keeping one degasifier in service, Clean the interior of each degasifier and test and restart each degasifier keeping one degasifier and Install a degasifier media cleaning system to serve both degasifiers, keeping one degasifier in service and test and start up the degasifier media cleaning system. | ||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |