Similar Projects
Pinkney Fuel Site Replacement Construction Management at Risk Services
Bidding
Sarasota, FL

Building #26 Gas Piping Repair Project
Post-Bid
Sarasota, FL

Fuel Management System Replacement/Upgrade
Post-Bid
Panama City, FL

Replacement of Emergency Standby Generator, Fuel Tanks and ats Along Florida'S Turnpike-South Region
Term Contract
Results

Replacement of Emergency Standby Generator, Fuel Tanks and ats Along Florida'S Turnpike-South Region
Term Contract
Results

Aircraft Self Fueling Facility
Construction
Less than $842,911 est. value
FL

500 Gallon Diesel Tanks
Post-Bid
Port Saint Lucie, FL 34984

Sodium Hypochlorite Tank Replacement
Results
Boynton Beach, FL

15400 Gallon Hydroxide Tank Disposal
Post-Bid
Boynton Beach, FL 33425

Fuel Farm Relocation
Results
Less than $791,000 est. value
Marianna, FL

Hillcrest Well Site - Hydropneumatic Tank Replacement
Results
FL

ATC Campus Thermal Energy Storage Tank and Site Work
Results
Daytona Beach, FL 32100

Fuel Tank Project Brandon Campus
Results
Less than $65,000 est. value
Tampa, FL

Fuel System Inspection and Repair Services
Term Contract
Results
Less than $250,000 est. value
Dania, Fort Lauderdale, Hollywood, Pembroke Pines, Pompano Beach, FL

Replace Double Wall Fuel Line
Results
$100,000 to $250,000 est. value
Panama City, FL 32403

Last Updated 06/05/2019 12:11 PM
Project Title

Peele-Dixie W. T. P Chemical Tank Replacements and Degasifier Improvements

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, FL   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,400,000
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description This project is located at 1500 South State Road 7, in the City of Fort Lauderdale. The work to be accomplished under this contract includes: the furnishing of all labor, equipment, and materials for removal and replacement of three, 11,500 gallon and one 950 gallon fiberglass sodium hypochlorite storage tanks and removal, disposal and replacement of degasifier media and installation of a degasifier media cleaning system. This project includes procurement, construction, testing, and placing in service, the equipment and materials.All materials, components and chemicals in contact with water in the treatment process must be NSF approved or Food Grade. In general terms, this project includes the following project elements covered by these Contract Documents: Relocate an exhaust fan, interior lights, conduits, wiring and supports out of the way of the work, Remove and dispose of existing removable concrete block wall panel measuring approximately 14 feet by 14 feet, Install a bifold door across the wall panel opening, Remove and dispose of existing chemical bulk storage and day tanks, including piping to the transfer pumps, Remove and replace the coating in the containment area for the sodium hypochlorite tanks, Install new chemical bulk storage and day tanks with all piping, connect to the transfer pumps, and provide startup services, Remove and dispose of the piping for the City ’ s existing temporary sodium hypochlorite system, including wall brackets and supports, Restore the south wall of the chemical building, including repair of damage resulting from the work, patching penetrations and holes resulting from removal of the temporary hypochlorite piping, checking the entire surface of the south wall for areas of delaminated stucco, replacing areas of delaminated stucco and painting the entire exterior south wall of the chemical building, Remove and replace degasifier media from two degasifiers, keeping one degasifier in service, Clean the interior of each degasifier and test and restart each degasifier keeping one degasifier and Install a degasifier media cleaning system to serve both degasifiers, keeping one degasifier in service and test and start up the degasifier media cleaning system.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents