Similar Projects
Water Fountain Installation
Term Contract
Bidding
Fort Worth, TX 76106

2020 Water Main Replacements
Infrastructure
Bidding
$2,050,000 est. value
Arlington, TX 76014

Northside II 30-Inch Water Transmission, Part 2
Post-Bid
$2,000,000 est. value
Fort Worth, TX 76102

Water Meter Installation
Post-Bid
Fort Worth, TX 76102

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water and Sanitary Sewer Replacement - Contract 2014 WSM-B Part 1
Results
Fort Worth, TX 76102

Infrastructure Contractors Annual Contracts
Term Contract
Bidding
Arlington, TX

Water and Sanitary Sewer Improvements for South Beverly Street and Race Street
Post-Bid
Crowley, TX 76036

Contract 2014 WSM-A Part 3
Results
Fort Worth, TX 76102

Water Line Improvements for Kings Avenue, Westchester Drive and East Belknap Street
Post-Bid
$490,700 est. value
Haltom City, TX 76117

NR Internal Pipeline Cleaning and CCTV Inspection FY20
Term Contract
Results
Dallas, Denton, TX

Lake Street Between Pond Street and Tarrant Street, Drainage and Water Improvements
Post-Bid
$186,300 est. value
Mansfield, TX 76063

Craig Hanking 20-inch Water Main (for Future NY EST)
Results
$339,000 est. value
Arlington, TX

Integrated Pipeline Project - Section 19 Long Tunnel Crossings
Infrastructure
Post-Bid
TX

Construction of PL19TX
Results
$15,800,000 est. value
Fort Worth, TX 76102

Last Updated 10/27/2021 07:18 AM
Project Title

KBR Yard Piping and Inlet and Outlet Modifications

Physical Address View project details and contacts
City, State (County) Kennedale, TX   (Tarrant County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $40,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing 72-, 84-, 90-, and 108-inch pre-stressed concrete cylinder piping; Install new 72-, 84-, 90-, and 108-inch steel pipe and owner furnished butterfly valves; Remove and replace existing embankments on the north and south sides of the two reservoirs and install new inlet and outlet pipes and structures; Abandon and grout existing inlet/outlet structures in the reservoirs; Install new overflow weirs on two embankment sections; Demolish and remove existing concrete splitter box structures; Provide new power and instrumentation to KBR from S1X10.

Details

Division 26 - Electrical.
Division 31 - Earthwork, Embankments.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents