Similar Projects
ArtsCenter
Renovation, Infrastructure - 17,864 SF
Design
$3,000,000 CJ est. value
Carrboro, NC 27510

Murray Hill at Meadowmont - Buildings 3 and 4
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Chapel Hill, NC 27517

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

UNC 6th Floor Neonatal Critical Care Center Expansion Project
Addition, Demolition, Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Chapel Hill, NC 27514

West Rosemary Street Office and Apartments
Demolition, New Construction, Infrastructure - 4,034 SF
Post-Bid
$1,500,000 CJ est. value
Chapel Hill, NC 27516

Global Leadership Center - University of North Carolina-Chapel Hill
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$8,000,000 CJ est. value
Chapel Hill, NC 27516

West Cameron Avenue Water Line Replacement - Phase 2
Infrastructure
Results
$3,400,000 to $3,600,000 est. value
Carrboro, NC 27516

Rogerson Drive Water Main Replacement
Infrastructure
Results
$2,000,000 est. value
Chapel Hill, NC 27517

The 203 Project / Carrboro - BP500 Prequalification
New Construction, Infrastructure
Construction
$26,071,297 CJ est. value
Carrboro, NC 27510

Greensboro Street Mixed-Use Development
New Construction, Infrastructure - 16,186 SF
Pending Verification
$10,000,000 CJ est. value
Carrboro, NC 27510

Residence Inn and Summit Place Townhomes
Addition, New Construction, Infrastructure
Pending Verification
$32,000,000 CJ est. value
Chapel Hill, NC 27514

1200 MLK Redevelopment
Demolition, New Construction, Infrastructure - 111,680 SF
Design
$12,000,000 CJ est. value
Chapel Hill, NC 27514

Refuel Market - Carraway Village
New Construction, Infrastructure - 4,769 SF
Post-Bid
$1,200,000 CJ est. value
Chapel Hill, NC 27516

Tarheel Lodging Redevelopment - Phase 2
Demolition, New Construction, Infrastructure - 354,492 SF
Pending Verification
$20,000,000 CJ est. value
Chapel Hill, NC 27517

Columbia Street Annex
New Construction, Infrastructure - 61,000 SF
Design
$20,000,000 CJ est. value
Chapel Hill, NC 27516

Last Updated 12/20/2022 07:31 PM
Project Title

Water Meter Vault Replacements at Royal Park and University Lake

Physical Address View project details and contacts
City, State (County) Carrboro, NC 27510   (Orange County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $366,345 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of furnishing all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete and operable installation of: The demolition and replacement of two separate water meter vaults and connecting water service piping between the vault and water main in locations servicing multi-family residential units in the Town of Carrboro. The major work items included in the Base Bid, as described in the Specifications and as shown on the Drawings, are as follows: Royal Park Apartments - replacement of existing concrete vault, 6-inch water meter and appurtenances, and upstream and downstream connection piping. University Lake Apartments - replacement of existing concrete vault, 4-inch water meter and appurtenances. and upstream and downstream connection piping. The foregoing description shall not be construed as a complete description of all work required. Bids will be received for a Unit Price General Construction Contract. The Contractor and all Subcontractors shall have valid North Carolina General Contractor's Licenses for the type and value of the work to be performed. Orange Water and Sewer Authority has adopted a minimum ten (10%) percent goal for participation by minority businesses in the total value of the work for this project in accordance with Section 143-128.2 of the General Statutes of North Carolina. To ensure that all Bidders are kept up to date on any Addenda, changes, or information notices, please send an e-mail to: kmattingly@mckimcreed.com indicating your intention to prepare a Bid for the Project. Failure to complete this step may render your Bid as non-responsive. Orange Water and Sewer Authority requires the Project to be at Substantial Completion within 150 consecutive calendar days from date of Notice to Proceed and at Final Completion 180 consecutive calendar days from date of Notice to Proceed. No Bid shall be considered or accepted unless at the time of its filing the same shall be accompanied by a deposit of a certified or cashier's check drawn on a bank or trust company insured by the Federal Deposit Insurance Corporation (FDIC), in an amount equal to five percent (5%) of the amount of the Bid. The check shall be made payable to Orange Water and Sewer Authority. Said deposit shall guarantee that the Contract will be entered into by the successful Bidder if the Award is made. Such deposit of certified or cashier's check may be held by Orange Water and Sewer Authority until the successful Bidder has executed and delivered the Contract Documents, including performance and payment bond, to Orange Water and Sewer Authority and returned or kept in accordance with North Carolina General Statute 143-129. In lieu of the certified or cashier's check deposit mentioned above, the Bidder may file a Bid Bond in the same amount executed by a corporate surety authorized to execute such bonds in North Carolina and conditioned as provided by North Carolina General Statute 143-129 and on the form(s) found in the Proposal section. Bid Bond forms enclosed as part of the Bidding Documents must be properly executed at the time Bids are submitted before a Bid will be considered. Properly executed Power of Attorney of the corporate surety's agent shall accompany such bond and be attached to the page provided therefore in the Bidding Documents. Orange Water and Sewer Authority reserves the right to accept or reject any or all Bids, to waive any and all informalities, and to disregard all nonconforming or conditional Bids or counter Bids, and to accept the Bid that will be in the best interest of Orange Water and Sewer Authority

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents