Similar Projects
Heat Pump Replacements at John Griffin Middle School
Bidding
Fayetteville, NC 28304

Heat Pump Replacements at MAC Williams Middle School
Bidding
Fayetteville, NC 28312

Water Supply Well #28
Post-Bid
Aberdeen, NC 28315

Bypass Pumping Service
Post-Bid
Charlotte, NC

Monitoring Well Installation at Merchants Millpond State Park
Results
NC

Construct Tanker Truck Delivery System
Results
$10,000,000 to $25,000,000 est. value
Goldsboro, NC

New Raw Water Main and Well Enclosure
Bidding
Newport, NC 28570

2016 Water System Improvements, Contract No. 14 - Well No. 65-CH and Well No. 66-PD
Post-Bid
Washington, NC

Dixon Well Sites D10 and D11 Phase 2
Results
Holly Ridge, NC

Test and Production Wells 3 and 4
Bidding
Lake Waccamaw, NC 28450

Dewatering Pump Rental
Term Contract
Post-Bid
Raleigh, NC

East Lake Operations Center Water Treatment Upgrade
Results
Less than $25,000 est. value
East Lake, NC

River Pump Motor, Removal and Installation
Bidding
Halifax, NC 27887

Floodwater Dewatering Pump Rental and Operations
Term Contract
Post-Bid
Nags Head, NC

Saline Well Repair With Pump Replacement - Edenton NFH, NC
Results
Edenton, NC

Reported 08/08/2019 12:00 AM
Project Title

Pump and Motor Repair Service

Physical Address View project details and contacts
City, State (County) Monroe, NC   (Union County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description 1. Removing/re-installing pumps, motors, etc. 2. Repairing/rebuilding pumps 3. Repairing/rewinding of motors 4. Transport to the vendors shop and return delivery to the affected site if required 5. Ann other repairs, maintenance, or tasks deemed necessary by Union County Public Works Staff 6. All applicable inspections must be completed prior to delivery of repaired equipment, i.e. UL listing or any other applicable certification 7. Provide detailed quote for repair scope within one(1) week of receipt of pump/motor 8. Repairs to be completed within one (1) week of procurement of material needed to affect necessary repairs. If more time is needed for the repair the vendor must notify Union County Public Works Staff 9. New Power and Control cables shall be added with every repair if applicable 10. The repair service shall be, unless otherwise stated in the service of the purchase order, in accordance with the methods and procedures of the manufacturer’s operational maintenance and repair manuals.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents