Similar Projects
I-80 Replace Bridge Struct's
Demolition, New Construction, Infrastructure
Conception
$16,390,905 CJ est. value
Howard, PA 16841

Hayes Run Bridge Box
Infrastructure
Conception
$743,748 CJ est. value
Potter Township, PA 16828

734 S. Atherton Student Housing Project
New Construction, Infrastructure - 256,000 SF
Design
$30,000,000 CJ est. value
State College, PA 16801

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

I-80 East Bound Lane from SR 3013 to SR 54
Infrastructure
Bidding
$50,000,000 CJ est. value
Clarence, PA 16823

SR 1002 Marsh Creek Bridge
Infrastructure, Renovation
Bidding
$2,500,000 CJ est. value
Howard, PA 16841

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Furnishing and Delivering Gate Valves
Alteration
Post-Bid
State College, PA

Green Hollow Park - Accessible Improvements Plan Phase 2 - Site Improvement
Infrastructure
Results
$70,000 est. value
State College, PA 16803

SCI Rockview Site Amenity/Infrastructure Improvement
Infrastructure
Results
$1,000,000 to $2,000,000 est. value
Bellefonte, PA 16823

East Halls Pump Station Upgrades
New Construction, Demolition
Construction
$1,980,000 est. value
University Park, PA

Academy Street Stormwater Project Rebid
Infrastructure
Construction
$69,879 CJ est. value
Boalsburg, PA 16827

Environmental Health and Safety (EH and S) Chemical and Radiation Waste Accumulation Facility
New Construction, Infrastructure - 11,000 SF
Pending Verification
$7,200,000 CJ est. value
State College, PA 16803

West College Avenue Mixed-Use Building
New Construction, Infrastructure - 15,516 SF
Pending Verification
$45,000,000 CJ est. value
State College, PA 16801

2025 Centre Bridge Preservation
Infrastructure, Renovation
Conception
$3,072,030 CJ est. value
State College, PA 16801

Last Updated 02/07/2023 12:12 PM
Project Title

Booster Station and Waterline Improvements

Physical Address View project details and contacts
City, State (County) Wingate, PA 16823   (Centre County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $4,300,000 [brand] Estimate
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a booster pumping station and replacement of approximately 25,000 linear feet of waterline. Bids are requested for the following Contract: 22-01. Bid security in the form a Certified Check or Bid Bond shall be furnished with the bid in an amount not less than 10% Question Deadline 01/31/2023 at 4:00 PM ET All questions about the meaning or intent of the Bidding Documents are to be submitted electronically. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Bidders must comply with all State antibid-rigging regulations pertaining to work associated with this project, and will be required to submit an executed non-collusion affidavit with the bid. Bidders should refer to provisions of federal and state statutes, rules and regulations dealing with the prevention of environmental pollution and preservation of public naturalresourcesthat affect the project, pursuant to Act No. 247 of the General Assembly of the Commonwealth of Pennsylvania, approved October 26, 1972. This Project falls under The Commonwealth of Pennsylvania enacted Act 127 of 2012, known asthe Public Works Employment Verification Act (the Act) which requires all public work contractors and subcontractors to utilize the Federal Governments E-Verify system to ensure that all employees performing work on public work projects are authorized to work in the United States. All Bidders are required to submit a Public Works Employment Verification Form as a precondition for the Contract Award. The estimated cost for or this project is greater than Twenty-five Thousand Dollars ($25,000) and the Pennsylvania Prevailing Wage Act shall apply. All bids shall be irrevocable for 60 days after the bid opening date as provided by the Act of November 26, 1978 (P.L. 1309, No. 317), as amended by the Act of December 12, 1994 (P.L. 1042, No. 142). All bidders are hereby notified that in regard to any contract pursuant to this advertisement, businesses will be afforded full opportunity to submit bids in response to this notice and will not be subjected to discrimination on the basis of gender, race, color, creed, sex, age, physical disability or national origin in consideration for an award. Similarly the successful bidder shall in no manner discriminate against or intimidate any employee involved in the manufacture of supplies, the performance of work, or any other activity required under the contract on account of gender, race, creed or color. The Walker Township Water Association, Inc reserves the right to waive any defects, errors, omissions, mistakes, informalities, to accept any bid or combination of bidsthat are deemed to be in the best interest of the Walker Township Water Association, Inc, and to reject any or all proposals.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents