Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Safe Routes to School Including Concrete Curb, Gutter and Sidewalk Ramps, Drainage, Signing and Pavement Markings on Various Routes
Infrastructure
Design
$1,828,489 CJ est. value
Charlotte, MI 48813

Safe Routes to School Including Concrete Curb, Gutter and Sidewalk Ramps, Drainage, Signing and Pavement Markings on Various Routes
Infrastructure
Design
$1,828,489 CJ est. value
Charlotte, MI 48813

DTMB Operations Center Parking Lot Rehabilitation - Phase 1
Infrastructure
Bidding
$50,000 CJ est. value
Windsor charter Township, MI 48821

DTMB Operations Center Parking Lot Rehabilitation - Phase 1
Infrastructure
Bidding
$50,000 CJ est. value
Windsor charter Township, MI 48821

Lawn Mowing and Snow Removal Services
Term Contract
Sub-Bidding
Bellevue, MI 49021

MSPTA - Drive Track Lighting Ph. 500
Infrastructure
Sub-Bidding
$25,000 CJ est. value
Windsor charter Township, MI 48821

Paving & Site Lighting
Post-Bid

County Wide Curb and Street Sweeping
Post-Bid
MI

Dunmore, Waverly, Weldon, Hartford Water Main Replacement Project
Results
Ann Arbor, Hartford, Waverly, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Overband Crack Fill
Infrastructure
Bidding
$200,000 est. value
Charlotte, MI

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

Calumet-Swedetown Trail Capping, And Route Grading
Results

Last Updated 08/05/2022 09:34 AM
Project Title

Hall Street Improvements

Physical Address View project details and contacts
City, State (County) Eaton Rapids, MI 48827   (Eaton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $283,245 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Complete replacement of asphalt pavement on Hall Street between Knight and King Streets in Eaton Rapids. Complete selective replacement of concrete curb and gutters. Perform inspection of water main for lead service leads. A pre-bid conference will not be conducted for this Project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents