Similar Projects
Fire Station
New Construction
Conception
McQueeney, TX 78123

New Fire Department Headquarters
New Construction
Conception
McKinney, TX

Penny Paws Animal Clinic
New Construction - 4,153 SF
Design
$600,000 est. value
DeSoto, TX 75115

Dog's Day Out
New Construction - 9,574 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Plano, TX

Police Department Passenger Elevator Modification Project
Renovation
Bidding
$815,000 est. value
Amarillo, TX 79101

Central Fire Station Building Renovations
Renovation
Bidding
Seguin, TX

Repair Vet Treatment Facility, Brooke Army Medical Center, Fort Sam Houston, TX
New Construction, Renovation - 6,492 SF
Post-Bid
$5,000,000 to $10,000,000 est. value
San Antonio, TX 78234

Haltom City Fire Station 3
New Construction
Post-Bid
Haltom City, TX 76117

Design-Build for Vehicle Maintenance Facility
Results
Less than $15,800,000 est. value
TX

Fort Bend County Emergency Services District No. 6 Fire Station No. 1
New Construction - 7,590 SF
Results
Richmond, TX 77469

Fire Station 6
Construction
League City, TX

Aldine Fire Rescue Station No. 11
New Construction - 15,185 SF
Construction
Houston, TX 77032

Destination Dog Ranch
New Construction - 17,300 SF
Design
$4,000,000 est. value
Montgomery, TX 77316

Police Tower 6th Floor Renovation
Renovation
Bidding
Waco, TX 76708

Fire Station #36
Post-Bid
Dallas, TX 75200

Last Updated 06/11/2021 03:33 PM
Project Title

Shari D. Coleman Animal Shelter & Adoption Center And Fire Station #4

Physical Address View project details and contacts
City, State (County) Pearland, TX   (Brazoria County)
Category(s) Animal/Plant/Fish Facility, Government/Public
Sub-Category(s) Animal/Plant/Fish Facility, Fire/Police Station
Contracting Method
Project Status Construction Commenced December 2020, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $15,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Pearland is seeking qualified Construction Managers at Risk (CMAR) to provide construction manager at risk services in connection with the final design and to perform the construction of 13,935 square foot Fire Station # 4 and 17,193 square foot Animal Shelter and Adoption Center. The estimated construction cost for the Fire Station project is $6.2 million dollars. The estimated construction cost for the Animal Shelter is $9.2 million dollars.

Details

,, 31,200 SF - 1 Fire/Police Station, 14,000 SF New Construction, 1 Animal/Plant/Fish Facility, 17,200 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents