Similar Projects
X-132, Replace 10 CRAC Units, NSN
Term Contract
Bidding
Norfolk, VA 23511

Central Energy Plant Chiller 3 Replacement
Alteration
Bidding
Norfolk, VA 23510

HVAC Preventative Maintenance Services
Post-Bid
Norfolk, VA 23511

Facility Sanitation HVAC Cleansing
Post-Bid
Norfolk, VA 23510

Maintenance and Repair Services on HVAC Direct Digital Control Systems
Term Contract
Results
Chesapeake, Norfolk, Portsmouth, Suffolk, Virginia Beach, VA 23320

Air Cooled Chiller Condenser Coils Replacement Services
Results
Norfolk, VA

Preventative Maintenance Of Hvac And Chiller Systems - Norfolk, Va
Term Contract
Bidding
Norfolk, VA 23510

Air Compressor Preventative Maintenance
Post-Bid
Norfolk, VA 23510

Air Handling Unit AHU and Variable Speed Drives VSD for E Sports Initiative
Results
Less than $132,590 est. value
Norfolk, VA 23529

HVAC Services- DMV Norfolk-Widgeon Road CSC
Post-Bid
Chesapeake, Norfolk, VA 23513

HVAC PM and Repair Services
Term Contract
Results
Gloucester, Hampton, Newport News, Norfolk, Suffolk, VA

HVAC and Mechanical Products
Term Contract
Post-Bid

DFS Eastern Lab Cooling Tower Replacement
Results
Less than $678,556 est. value
Norfolk, VA

Replace HVAC, Bldg SP-366
Post-Bid
$500,000 to $1,000,000 est. value
Norfolk, VA

Pipe and Ductwork Insulation Repair Services
Results
Norfolk, VA

Last Updated 08/24/2021 10:24 AM
Project Title

Crittenton Hall HVAC Upgrades

Physical Address View project details and contacts
City, State (County) Norfolk, VA 23508   (Norfolk City County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency - 05/26/21
Owner View project details and contacts
Architect View project details and contacts
Description

Work shall consist of and is generally described as work including replacement of the HVAC for the approximately 5,500 sf Crittenton Hall facility, fully understanding that the building will need to remain operational so phased construction and temporary air conditioning will be required.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents