Similar Projects
East Avenue Reconstruction
Infrastructure
Bidding
Iron Ridge, WI 53035

North Mendota Trail Paving
Infrastructure
Bidding
Waunakee, WI 53597

Sidewalk and Curb Replacement
Post-Bid
$5,000 est. value
Winter, WI 54896

2021 Sidewalk Improvement Project
Post-Bid
$103,605 est. value
Portage, WI

East 9th Street - Street and Utility Improvements
Results
Owen, WI 54460

Asphalt Pavement Resurfacing, Replace Curb and Gutter, Sidewalk and Driveway Approaches
Results
Milwaukee, WI 53202

Downtown Eau Claire River Trail
Infrastructure
Bidding
Eau Claire, WI

2021 Kansas Street - Street and Utility Improvements
Post-Bid
Horicon, WI 53032

Dunning Street, Jackson Street and Lafollette Avenue Reconstruction Assessment District - 2020
Results
Less than $4,034,805 est. value
Madison, WI 53704

Barbara Street Reconstruction and Jeanne Court Rehabilitation
Infrastructure
Bidding
$900,000 est. value
Sun Prairie, WI 53590

2021 Curb, Gutter and Sidewalk
Term Contract
Post-Bid
Reedsburg, WI

East Lake Street Reconstruction
Results
Horicon, WI 53032

Kenosha Campus Parking Lot C Repairs
Infrastructure
Bidding
Kenosha, WI 53144

2021 Minor Street Improvements
Post-Bid
Clintonville, WI 54929

West 9th Avenue Reconstruction
Results
Oshkosh, WI 54901

Last Updated 03/04/2022 05:58 PM
Project Title

Plisch Street - Curb and Gutter

Physical Address View project details and contacts
City, State (County) Athens, WI 54411   (Marathon County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove Existing Curb and gutter and haul to Village Dump Site Pour new Curb and gutter or Driveway curb as needed Lawn repairs including mulch to be included Provide Road Base inside of driveways on Plisch Street Plisch Street note: The Village is installing new asphalt on this street in 2022 Blacktop cutting to be included Work to be completed by May 15, 2022 New curb to be installed so water flows in the direction as the existing curb allows Payment will be per lineal foot of what curb is actually replaced. This will be determined prior to removal of curb by Street Committee or Village employees. Blacktop patching on Plisch Street-none Blacktop patching on Nathan, Parkview and Damon Streets: To be done by Village. Contractor to include gravel to grade of street as a temporary repair

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents