Similar Projects
Bremerton Station
Renovation, Infrastructure
Conception
Bremerton, WA 98310

Derek Apartments Phase 1
New Construction, Infrastructure - 400,000 SF
Design
$10,000,000 CJ est. value
Spokane Valley, WA 99206

Foothills Trail - East Puyallup Trail Head Expansion - 3240 - Pierce County
Infrastructure
Design
Tacoma, WA

Madison District Green Infrastructure
Infrastructure
Bidding
$10,500,000 to $11,500,000 est. value
Tacoma, WA

Northeast Neighborhood Development Phase One
Infrastructure
Bidding
$6,500,000 to $7,500,000 est. value
Aberdeen, WA

Ephrata Headquarters Pedestrian Crosswalk Replacement
Infrastructure
Post-Bid
$90,000 est. value
Ephrata, WA

Sylvester Street Safety Improvements
Infrastructure
Post-Bid
Pasco, WA 99301

Nugget Park Sidewalk Replacement
Infrastructure
Results
$275,000 to $350,000 est. value
Brier, WA 98036

Engineering Services for Parking Lot And Trailhead Development & Stormwater Management Plan
New Construction, Infrastructure
Results
Blaine, WA 98230

Mercy Housing Affordable Senior Development
New Construction - 43,000 SF
Construction
$1,849,000,000 est. value
Tacoma, WA 98405

Alexandria Center for Science and Technology / Bellevue
New Construction, Infrastructure - 716,000 SF
Design
$250,000,000 est. value
Bellevue, WA 98005

BPA Paving and Parking Lot Repair
Infrastructure
Bidding
$150,000 to $500,000 est. value
Camas, WA

SR 116 and Cedar Avenue Pedestrian/Bike Improvements
Infrastructure
Post-Bid
Port Townsend, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

D/B - Laurier Land Port of Entry - Concrete, Paving, Painting
Infrastructure
Design
$1,000,000 est. value
Laurier, WA

Last Updated 07/20/2022 03:06 AM
Project Title

2022 Sidewalk Repair

Physical Address View project details and contacts
City, State (County) Lacey, WA   (Thurston County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $315,000 to $525,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract provides for the removal of tree stumps, installation of root barrier, replacement of topsoil to grade, removal and replacement of traffic curb, sidewalk and driveway entrances, and other work as outlined in bid documents. Each bid must be accompanied by a certified check for five percent of the amount of the proposal made payable to the City Treasurer, or an approved bid bond for five percent of the amount of the proposal executed on the approved form attached to these specifications. If bid bond is used, the five percent may be shown in dollars and cents or the form may be filled in by inserting therein, in lieu thereof, "five percent of the amount of the accompanying proposal". Check of unsuccessful bidders will be returned immediately upon award of contract. The City Council reserves the right to reject any and all bids and to waive all informalities.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents