Similar Projects
Last Updated | 07/30/2021 07:49 AM |
Project Title | Phase II WWTP Expansion to 0.2 MGD for Dry Creek |
Physical Address | View project details and contacts |
City, State (County) | Richmond, TX 77469 (Fort Bend County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,250,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The site work contractor is responsible for all site work, including but not limited to construction of on-site force main piping, underground piping at Train No. 2; concrete pads and sidewalks; underground duct banks; pull boxes; modifications to the existing service/distribution rack and existing blower control panel; all associated electrical and site work; facility start-up in its entirety; and all else specified and shown in the construction documents and not explicitly specified in the lease agreement, complete in place for a fully functioning plant. The lease of the 100,000 gallon per day package wastewater treatment plant shall include delivery and assembly of the plant with all accessories and equipment; the aeration basin; multi-stage digester unit; a final clarifier; additional disks for the existing tertiary filters; turbidimeters for the existing tertiary filters; walkways, bridges, and handrails; air diffusion equipment; air lifts; flow measurement equipment; a third blower; aboveground interconnecting piping, valves, fittings, supports; hose bibbs; control panel for equipment including the clarifier, modifications to the existing blower control panel; basin lighting; electrical conduits and conductors; all accessories, equipment, piping, etc. within the plant, complete as specified. Within the plant is all the plant related functions from the stub up for the force main upstream of the screening and flow splitting box, to the existing effluent piping connection downstream of the chlorine contact basin. The lease plant installation shall be the responsibility of the lease plant vendor. Installation includes all delivery, installation and start-up. The site work contractor shall coordinate with the lease plant vendor for all connections and slab dimensions. |
||||||||||||||||||||||||||||||||||||||||||
Details | Sewage Treatment Plant, New Construction.
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |