Similar Projects
SR 20/Tributary to Thornton Creek - Culvert Replacement
Infrastructure
Conception
$871,000 CJ est. value
Twisp, WA 98856

Salmon Meadows Road Rehabilitation
Infrastructure
Design
$1,000,000 CJ est. value
Conconully, WA 98855

Loup Loup Creek Fish Passage
Infrastructure
Bidding
$165,000 CJ est. value
Nespelem, WA 99155

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

6th Street Improvements Project
Infrastructure
Results
$661,391 CJ est. value
Coulee Dam, WA 99116

Old 97, Verestar to Plata
Infrastructure
Results
$1,308,354 CJ est. value
Brewster, WA 98812

Armstrong Peel Smith Creek Watershed Water Quality Project 2022
Infrastructure
Construction
$4,000,000 CJ est. value
Nespelem, WA 99155

Sitework - Portable Foundation (Structural Drawings)
Infrastructure
Post-Bid
$200,000 est. value
Okanogan, WA

Wells WLA Headquarters Septic Replacement
Infrastructure
Results
$21,400 CJ est. value
Brewster, WA 98812

Carlton AF Domestic Well
Infrastructure
Post-Bid
$275,000 CJ est. value
Twisp, WA 98856

RFP Engineering - Channel Restoration and Bank Protection in Salmon Creek and Culvert Replacement in Loup Loup Creek
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Nespelem, WA 99155

(POTW) Publicly Owned Treatment Works Improvements - Town of Twisp
Renovation, Infrastructure
Post-Bid
$11,000,000 CJ est. value
Twisp, WA 98856

Channel Realignment and Bank Protection in Salmon Creekin Salmon Creek
Infrastructure
Post-Bid
$400,000 CJ est. value
Nespelem, WA 99155

Construction of the Oroville Orchard Apartments
New Construction, Infrastructure
Post-Bid
$3,100,000 CJ est. value
Oroville, WA 98844

Last Updated 05/05/2023 07:05 PM
Project Title

Construct Helipads

Physical Address View project details and contacts
City, State (County) Winthrop, WA 98862   (Okanogan County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Estimated Range $500,000 to $1,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents