Similar Projects
J041--*SPECIAL* Hines and Joliet Critical Cooling Repairs
Design
Hines, IL 60141

ABB HVAC Drivers
Post-Bid
Chicago, IL 60602

Heating Small Construction Repairs in the Emergency Heating Repair Program - JOC
Term Contract
Post-Bid
Less than $1,800,000 est. value
Chicago, IL 60602

Kitchen Hood Installation at Kilmer Elementary School
Results
est. value
Chicago, IL 60626

Brooks And Holmes Boiler Renovation
Results
Harvey, IL 60426

Service Contract for Heating, Ventilating, Air Conditioning and Temperature Controls
Term Contract
Post-Bid
Calumet City, IL 60409

Chiller Repair at National Teachers Academy
Results
Chicago, IL 60602

Boiler 1 And 3 At Dusable High School
Post-Bid
Chicago, IL 60615

HVAC and Control System Repairs Sherwood ES
Results
Chicago, IL 60035

FSCC Chiller Maintenance
Post-Bid
Chicago, IL 60608

Geothermal Leak Repair - Goode High School
Results
Chicago, IL 60652

RTU HVAC System Improvements
Post-Bid
Maywood, IL 60153

Replace Absorber with New Chiller
Results
Less than $1,500,000 est. value
Broadview, IL 60141

Abb Hvac Drivers
Term Contract
Post-Bid
Chicago, IL 60612

RTU Collins HS
Results
Chicago, IL 60623

Last Updated 02/15/2022 04:26 PM
Project Title

J041--Repairs need to HVAC System(578)

Physical Address View project details and contacts
City, State (County) Hines, IL   (Cook County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall provide all labor, management, materials, parts, and equipment to repair critical cooling systems at the Edward Hines, Jr. VA Hospital. The critical cooling systems shall be repaired with urgent priority: 1. The chiller for Bldg.1 B404 had a compressor fail with the controls. This unit is critical to the operation of the Veterinary Medical Unit (VMU) and needs to be replaced in FY21. Due to the age of the unit and prior repairs exceeding 90k, putting additional fund into the unit will not ensure reliability. This unit is beyond economical repair and needs to be replaced. 2. The steam heating coils associated with the Bldg.1 B404 Air Handling Unit (AHU) have been repaired numerous times, each time reducing capacity of the coils. They have since shown even more leaks that cannot be repaired. Replacement of these steam coils is paramount to maintaining proper temperature and humidity control in the VMU. 3. The uninvent heaters in Bldg. 9 were removed to replace the flooring in December 2020. During removal it was found the controls do not operate and parts are unavailable for re-installation of these heaters. Replacement of these uninvent heaters are required to prevent freezing of the piping in the building.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents