Similar Projects
RFQ - Assist with Long-Range Facilities Planning
Term Contract
Bidding
Bremerton, WA 98337

RFQ Design - Research Campus Addition Project
Renovation, Infrastructure
Bidding
$30,000,000 CJ est. value
Manchester, WA 98353

Water System Zone Intertie Design Preparation
Infrastructure
Post-Bid

On-Call Geotechnical Engineering Consulting Services
Term Contract, Infrastructure
Post-Bid
$150,000 est. value
WA

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Strategic Planning and Operational Flexibility (SPOF) Support
Term Contract
Results
Saint Marys, GA - Bangor, WA 31558

RFP - Professional Engineering, Architectural, Hydrogeologic, Electrical and Telecommunications Consulting Services
Term Contract
Bidding
Poulsbo, WA 98370

Engineering Consultant Services for On-Call Geotechnical Services
Term Contract
Post-Bid
WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

RFQ - Oversight, Review, and Quality Assurance/Quality Control of Selected Capital Projects at Olympic View Transfer Station
Term Contract
Bidding
Bremerton, WA 98312

6th Street Pavement Preservation Phase III
Term Contract, Infrastructure
Post-Bid
Bremerton, WA 98337

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

Electrical Engineering Services
Infrastructure
Post-Bid

Winslow Water Tank Replacement
Infrastructure
Results
Bainbridge Island, WA

A/E Professional Services for Bethel Phase 1 - Street Improvement Project
Infrastructure
Post-Bid
Port Orchard, WA 98366

Last Updated 11/16/2022 06:03 PM
Project Title

RFQ Engineering - View Ridge Elementary - Almira Drive Safe Routes to School

Physical Address View project details and contacts
City, State (County) Bremerton, WA 98310   (Kitsap County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected January 2026
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

From consulting firms with expertise in Civil and Structural Engineering Design. This agreement will be for approximately three years in duration with the option for the City of Bremerton to extend it for additional time and money if necessary. Consultants will be considered for the following project. The City of Bremerton reserves the right to amend terms of this "Request for Qualifications" (RFQ) to circulate various addenda, or to withdraw the RFQ at any time, regardless of how much time and effort consultants have spent on their responses. The work to be performed by the CONSULTANT consists of preparing preliminary engineering design, environmental permitting support, and right-of-way acquisitions for pedestrian, bicycle, roadway, and minor city utility improvements along the designated street corridors in the vicinity of View Ridge Elementary. The proposed improvements include but are not limited to the construction, reconstruction, and/or retrofit of ADA compliant sidewalks and curb ramps, bicycle facilities including bicycle lanes and shared-use paths, pedestrian crossing treatments include RRFB's, corridor traffic calming, roadway reconfigurations, retaining walls, and pedestrian lighting. Phase I - The general limits of these improvements include Spruce Ave (View Ridge Elementary - Sylvan Way), Sylvan Way (Spruce Ave - Almira Dr), E 33rd St (Spruce Ave - Almira Dr), Almira Dr (Sylvan Way to Ivy Rd). The project also includes evaluation and design of a preferred shared-use path corridor to route bicycles safely from Almira Dr to View Ridge Elementary (via E 33rd St) as an alternate route from Sylvan Way. Construction of the project is scheduled for early 2026. Phase II (Future Phase) - The general limits of these improvements include Almira Dr (Ivy Rd - Riddell Rd). Construction of the project dependent on project funds being committed, but may include concurrent construction with Phase I. Please see the City's website, for a copy of the grant application and additional supporting documentation. For continuity of the project, the firm chosen under this RFQ may be contracted for Phase II project services dependent on award by WSDOT and acceptance of those funds by the City of Bremerton. Also, the City of Bremerton reserves the right to retain the services of the successful firm(s) for any subsequent project phases (such as Construction Phase Services) associated with this project. Evaluation Criteria Submittals will be evaluated and ranked based on the following criteria: 1) Qualifications of the Proposed Project Manager and Key Team Members 2) Qualifications and Experience of Firm/Team on Similar Projects 3) Firm/Team Approach to Project 4) Firm/Team Ability to Meet Schedule 5) Firm/Team Familiarity with Bremerton/WSDOT/FHWA Standards 6) Firm/Team Past Performance Submittals should include the project name in the subject line and the following information in the body of the email: Project name; Firm name, phone and fax numbers; Name of Principal-in-Charge and Project Manager. It is recommended under Message Properties that the box for "Request a delivery receipt for this message" be checked as this is the only method by which verification of delivery will be given. CONSULTANTS are invited to submit their Statement of Qualifications (SOQ's) at their own cost. The CITY assumes no obligation of any kind for expenses incurred by any respondent to this solicitation. The submittal must be submitted formatted as follows: o Submitted as an 8.5" x 11" sheet, single sided only, and with text (font) size no smaller than 12 points; and o If charts and/or graphs are utilized, text (font) size must be no smaller than 8 points. Your SOQ must consist of: o Your letter of Transmittal; o Your responses to Evaluation Criteria 1 through 6 o The SOQ packet is limited to 15 pages, single sided only, not including the front and back cover. The SOQ shall meet the following requirements or may be deemed non-responsive and will not be eligible for consideration of this work: o Title of the SOQ and your firm clearly identified on the cover of the submittal packet and the letter of transmittal; o Name of Principal-in-Charge and Project Manager, and number of employees in each firm proposed on the project; o Responsiveness to all evaluation criteria; o Meeting page limitations and font size requirements; o Meeting submittal deadline submission date and time. Any questions regarding this project should be directed to Nick Ataie, Project Manager, by email at nick.ataie@ci.bremerton.wa.us or by calling (360) 473-2306. Americans with Disabilities Act (ADA) Information The City of Bremerton in accordance with Section 504 of the Rehabilitation Act (Section 504) and the Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in all of its programs and activities. This material can be made available in an alternate format by emailing Cathy Bonsell at cathy.bonsell@ci.bremerton.wa.us or by calling collect (360) 473-5717. Title VI Statement The City of Bremerton in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award The method of Contractor Selection has not been Determined at this time.

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents