Last Updated | 04/28/2023 12:12 PM |
Project Title | Water Plant Rehabilitation Phase II |
Physical Address | View project details and contacts |
City, State (County) | Sugar Land, TX 77479 (Fort Bend County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $993,500 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of April 28, 2023, the project has not been awarded. A timeline for award has not been confirmed. The project includes, but not limited to, the following: Greatwood East Groundwater Plant Pump and Valve Replacements: The replacement of three horizontal split case pumps, motors, electrical conductors from the motor control center (MCC) to the motor, piping and select valves as shown on the drawings and specified. Thompson Chapel Groundwater Plant Pump and Valve Replacements: The replacement of four vertical turbine booster pumps, cans, motors, electrical conductors from the MCC to the motor, piping select valves, and reinforced concrete slab as shown on the drawings and specified. The deadline to ask questions is 5/30/2022 5:00 PM CST |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |