Similar Projects
Drainage Improvements for Section A, Russell Road
Bidding
Less than $90,000 est. value
Chardon, OH 44024

Precast Concrete Headwalls
Bidding

Fabric Concrete Bag Reventment
Results

Box Culverts
Results

Concrete Pipes
Results

Culvert Replacement
Results
OH

Cloverdale Drainage Repairs
Results
OH

Culvert Replacement - SR 44-13.05
Results
OH

Wilson Mills Road Drainage Improvements, CH 8AC
Results
$270,000 est. value
Chesterland, OH

Slide Repair - IR275-2.62 (55.70)
Results

Heath Road Embankment Stabilization
Results
Less than $160,000 est. value
Chesterland, OH

Taylor Wells Road Drainage Improvements, TR 113Bc
Results
Less than $260,000 est. value
East Claridon, OH

Headwater Stream and Wetland Restoration Design/Build
Results
South Russell, OH 44022

Culvert Invert Paving
Term Contract
Results

Sunnybrook Preseve Streambank Stabilization and Riparian Restoration Design/Build
Results
Chardon, OH 44024

Last Updated 05/13/2019 01:58 PM
Project Title

Snow Road Drainage Improvements

Physical Address View project details and contacts
City, State (County) Burton, OH   (Geauga County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Replacement of 4 culverts. The proposed culverts consist of two 18” reinforced concrete pipes, one 42” reinforced concrete pipe and one 9’x4’ box culvert.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents