Similar Projects
Coastal Storm Risk Management Project South Hutchinson Island Initial Construction 2021 St. Lucie County, Florida
Term Contract
Design
$10,000,000 to $15,000,000 est. value
FL

McCarty Ranch Extension Water Quality Restoration Project for Area 4
Infrastructure
Bidding
$1,800,000 est. value
FL 34987

C-25 Canal Banks Repairs
Infrastructure
Bidding
FL

Wells and Pressure Tank Purchase and Installation Services
Post-Bid
Fort Pierce, FL 34945

Portofino Shores Lake Bank Restoration
Post-Bid
$484,650 to $530,510 est. value
Fort Pierce, FL

Ten Mile Creek Oxbow Restoration
Results
Fort Pierce, FL

McCarty Ranch Extension Water Quality Restoration Construction Project - Area 3
Results
Less than $2,000,000 est. value
Port Saint Lucie, FL 34984

Progressive Cavity Pump - Sludge Feed Pump
Post-Bid
Port Saint Lucie, FL

Park and Ride Lots
Results
Less than $2,718,616 est. value
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Drainage Repairs and Improvements
Results
Less than $200,000 est. value

Metal Culverts
Infrastructure
Post-Bid
Port Saint Lucie, FL

Emergency Dune Restoration and Miscellaneous Beach Services
Term Contract
Results
Fort Pierce, FL 34982

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Injection Well Mechanical Integrity Test (MIT)
Results
$22,438 est. value
Port Saint Lucie, FL 34983

Reported 07/20/2021 09:52 AM
Project Title

Pump Stations and Irrigation Ponds - Annual Inspection, Dives, Repair and Debris Removal

Physical Address View project details and contacts
City, State (County) Port Saint Lucie, FL   (Saint Lucie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Pumps and Wells, Shoreline/Erosion/Drainage
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove debris, and repair any stormwater facility within the City. These facilities may include, but not limited to, stormwater pump stations, the stormwater irrigation systems or water control structures. Annual inspection and clearing of the Tiffany, Blackwell, and Calais stormwater pump stations and twenty-one locations where the irrigation system draws from stormwater ponds. The annual inspections shall use cameras and divers, to ensure that the pump intakes are free from debris, that there are no leaks from the driveline above the sealed bronze bearings and they system is in proper working order. The annual work shall include services to remove debris and obstruction so that the facility is able to operate without obstructions

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Storm Drainage Utilities, Ponds and Reservoirs.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents