Similar Projects
Replace Air Cooled Chiller
Alteration
Bidding
Raleigh, NC

Scott Hall HVAC Upgrades - Phase II
Term Contract
Bidding
$763,000 est. value
Raleigh, NC 27607

Cooling Tower Replacement
Post-Bid
Raleigh, NC 27610

Air Conditioning Equipment
Post-Bid
Raleigh, NC 27603

Chiller Replacement - Lee Hall
Results
Less than $600,000 est. value
Raleigh, NC

HVAC Equipment at North Carolina State Lab of Public Health
Term Contract
Results
Less than $15,986 est. value
Raleigh, NC 27607

Jordan Hall HVAC Renovation
Alteration
Bidding
$700,000 est. value
Raleigh, NC 27695

Heating and Air Equipment
Post-Bid
Raleigh, NC 27603

Fuquay Varina Middle School Chiller Replacement
Results
Fuquay-Varina, NC 27526

Pullen Aquatic Center HVAC Improvements
Post-Bid
Raleigh, NC 27606

HVAC Unit Replacement
Results
Raleigh, NC 27601

Century Station Air Cooled Chiller Replacement
Post-Bid
$25,000 to $100,000 est. value
Raleigh, NC 27601

HVAC Demolition and Installation at Pullen Park Carousel Building
Results
Raleigh, NC 27606

Weatherization Services HVAC, Plumbing, Electrical, Insulation and Air Sealing Contractors
Renovation
Post-Bid

Chiller Installation and Repair
Term Contract
Results
Raleigh, NC 27610

Last Updated 06/21/2021 04:46 PM
Project Title

NCCCS #2284 Mechanical Equipment Replacements Group 4 - Multiple Chiller Replacements

Physical Address View project details and contacts
City, State (County) Raleigh, NC   (Wake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,089,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will be installation of a new chiller to serve Wake Technical Community College South Campus Building SC. With associated primary and secondary pumps, piping to existing AHU-1 and the upgrades of the chilled water controls. Project also includes as alternates the replacement of chiller CH-1 at Building SE on the Wake Technical Community College South Campus with upgrades of the chilled water controls, and the replacement of chiller CH-1 at Building HB at the Wake Technical Community College Perry Health Center Campus with upgrades to the chilled water controls.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents