Similar Projects
Contract 2 - BIA Pressure Zone Infrastructure Expansion - Booster Pump Station
New Construction - 1,300 SF
Bidding
Bangor, ME

Upgrade to Sanitary Sewer Pump Station
Renovation
Post-Bid
Brunswick, ME

Z--ACAD 312255 Rehab Schoodic Water System
Renovation, Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
New Sweden, ME 04762

Oak Grove Pump Station Improvements
Results
Brewer, ME

P-381 Multi-Mission Dry Dock #1, Portsmouth Naval Shipyard (PNSY), Kittery Maine
Results
$500,000,000 est. value
Kittery, ME

Pump Station 2 & Passamaquoddy Road Sewer & Water System Improvements
New Construction, Demolition - 17,060 SF
Construction
Perry, ME 04667

Horrigan Court Pump Station Upgrade
Renovation
Post-Bid
Biddeford, ME 04005

Hospital Street Booster Station Upgrades
Results
Augusta, ME 04330

Cove Road and Washington Street Pump Station Upgrades
Renovation
Post-Bid
$1,165,000 est. value
Camden, ME 04843

Water Street Pump Station Upgrades Pump Procurement Project
Results
Ellsworth, ME 04605

Kennebec Sanitary District Main Pump Station Force Main Upgrade
Results
$640,000 est. value
Waterville, ME

Pump Station 5 - Wildwood
Renovation
Results
Augusta, ME 04330

Gilpatrick Cove and Garry Moore Pump Station Improvements
New Construction
Results
Mount Desert, ME

North Yarmouth Booster Pump Station
New Construction
Results
North Yarmouth, ME 04097

Pump Station and Sewer Extension
Results
Less than $3,810,000 est. value
Poland, ME

Last Updated 04/04/2022 03:48 AM
Project Title

Baxter Boulevard Pump Station Upgrades

Physical Address View project details and contacts
City, State (County) Portland, ME 04103   (Cumberland County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the refurbishment of the Baxter Boulevard Pump Station, including replacing the electrical, generator, HVAC, equipment, instrumentation and controls, adding an additional effluent sewage pump, reconfiguring the interior force main piping, removing the existing underground storage tank and adding a new interior diesel storage tank, and all associated work.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents