Similar Projects
East Central Avenue Raw Water Line Relocation
Infrastructure
Bidding
$291,995 CJ est. value
Carthage, MO 64836

East Central Avenue Raw Water Line Relocation
Infrastructure
Bidding
$291,995 CJ est. value
Carthage, MO 64836

Highway Department Maintenance Facility - Phase 2
Post-Bid
Carthage, MO

Watermain Relocation for 32nd Street Place Improvements
Infrastructure
Post-Bid
Joplin, MO

32nd Street Widening Central City Road to Schifferdecker Avenue
Infrastructure
Results
Joplin, MO 64804

JCHMF Phase 2 – Water Supply Well
Infrastructure
Results
Carthage, MO

Tee Time Golfing Facility
New Construction, Infrastructure - 10,500 SF
Pending Verification
$5,000,000 CJ est. value
Webb City, MO 64835

Tee Time Golfing Facility
New Construction, Infrastructure - 10,500 SF
Pending Verification
$5,000,000 CJ est. value
Webb City, MO 64835

Carl Junction Rte. Z/Pennell St. Sidewalk Improvements, Phase V
Infrastructure
Bidding
$300,000 CJ est. value
Carl Junction, MO 64834

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

10th and Main Culvert Replacement
Infrastructure
Results
Joplin, MO

State University Campus Improvements Phase I
Infrastructure
Post-Bid
Joplin, MO

Memorial Park Trail
Infrastructure
Results
Joplin, MO

16th and 25th Street Drainage Improvements
Infrastructure
Post-Bid
Duquesne, MO 64801

2021 Bank Stabilization & Navigation Project (Bsnp) Structures Repair
Term Contract
Results

Last Updated 08/15/2022 12:02 PM
Project Title

7th and Canterbury Lane Stormwater Improvements

Physical Address View project details and contacts
City, State (County) Joplin, MO 64801   (Jasper County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $481,560 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project generally consists of storm sewer improvements along East 4th Street south of Canterbury Lane to the Target loading dock, replacement of the culvert under North park Lane, and replacing the existing drainage ditch northeast of Canterbury Lane including grading, unclassified excavation, curb and gutter, concrete pavement repair, sanitary sewer encasement, segmental retaining wall, storm sewer, wing walls, inlets, manholes, concrete drainage channel, concrete flume, riprap, erosion control, seeding, traffic control, and other appurtenances required for a complete project. Questions regarding bids shall be directed to Olsson - Attn: Aaron Boll, P.E. consulting engineer by email at aboll@olsson.com. Deadline for questions shall be 5:00 PM July 27, 2022.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents