Similar Projects
Carmel Life & Learning Center Interior Finishes Remodel 2023
Build-out
Bidding
$2,750,000 CJ est. value
Carmel, IN 46032

Zionsville Community Schools - District Wide Roofing Repairs, ZMS Flooring Renovations & ZCHS Whiteboard Repairs
Renovation
Bidding
$4,500,000 CJ est. value
Zionsville, IN 46077

Hilltop Apartments RA3 Stairwell Concrete Repair 2022
Renovation
Sub-Bidding
$500,000 CJ est. value
West Lafayette, IN 47906

Concrete and Materials
Post-Bid
Logansport, IN

Fenced Compound & Lattice Tower
Alteration
Post-Bid
Huntington, IN

Concrete Street Repairs in Brookview Heights
Results
Evansville, IN

Concrete Street Repairs
Infrastructure
Results
Evansville, IN

2021 Amberleigh Village Concrete
Infrastructure, Alteration
Post-Bid
West Lafayette, IN 47906

State Road 1 Pedestrian Crossings
Infrastructure
Results
Bluffton, IN

Steel Work and Concrete Packages - Fall Creek Jr. HS Renovations
Alteration
Post-Bid
Fishers, IN 46037

Brandonwood Concrete Street Repairs
Infrastructure, Alteration
Results
Fort Wayne, IN

Concrete Work
Alteration
Post-Bid
Reynolds, IN

White Oak Concrete Street Repairs
Infrastructure, Alteration
Results
IN 46895

Concrete Cut Repair Services
Term Contract, Alteration
Post-Bid
Fort Wayne, IN

Harvester Community Concrete Street Repairs, Phase 1
Infrastructure, Alteration
Results
Fort Wayne, IN 46803

Last Updated 11/15/2022 09:03 AM
Project Title

Boone Grove High School Campus Improvements and Related Work

Physical Address View project details and contacts
City, State (County) Valparaiso, IN 46385   (Porter County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $8,486,500 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The successful bidder shall, upon acceptance of his bid, be required to procure and pay for a Contractor's Bond for Construction (Form 86A or AIA Form A312) in an amount equal to 110 percent of his contract price. In the case of the School Corporation, such bonds shall comply with all laws of the State of Indiana governing public contracts let by governmental units. Bids should be made on the form included in the Project Manual which is based on the Indiana State Board of Accounts Form 96 (Revised 2013), and shall be accompanied by an acceptable certified check, cashier's check, or bid bond, executed by the bidder and an acceptable surety company, payable to the order of the School Corporation, in an amount not less than five percent (5%) of the total bid. In the event any bidder withdraws his bid or fails to execute a satisfactory contract or contracts and furnish a satisfactory performance bond or bonds within ten (10) days after a contract or contracts has been awarded to such bidder by the School Corporation, said School Corporation may declare his certified check or cashier's check or bid bond forfeited to said School Corporation as liquidated damages. The School Corporation shall have the right: to accept any Bid within sixty (60) days after the time of opening of the Bids, during which time no Bids shall be withdrawn; at any time to reject any and all Bids; and to waive all formalities or irregularities in the bidding. (Question and Answer Period): Scheduled at 2:00 pm, local time, on September 15, 2022. Refer to Instructions to Bidders for more information. Contractors will be required to complete their work within a certain specified period as provided in Section 01 11 00 of the specifications. *Gough Inc. requests bids be submitted to: mvetor@goughinc.com no later than 2:00 PM, September 28, 2022.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents