Similar Projects
Water Meter Replacement
Infrastructure
Design
$83,850 CJ est. value
Porterdale, GA 30014

Burwell Trunk Sewer Replacement
Infrastructure
Bidding
$578,000 CJ est. value
Rome, GA 30161

Sanitary Sewer System Rehabilitation Program Fiscal Year 2023-2025
Infrastructure
Bidding
$300,000 CJ est. value
Columbus, GA 31901

Water Treatment Plant
Renovation
Sub-Bidding
$600,000 CJ est. value
Crawford, GA 30630

Relocate 2 Backflow Preventers (BFP)
Renovation
Sub-Bidding
$100,000 CJ est. value
Athens, GA 30605

UGA Mechanical, Electrical, Plumbing Task Order Contract
Alteration
Post-Bid
Athens, GA 30602

Plumbing - Interior Renovation for Historical Courthouse
Alteration
Post-Bid
Trenton, GA 30752

Unpaved Roads - Phase 1, Braeburn Drive, Hirsh Street
Infrastructure
Results
$2,398,839 CJ est. value
Atlanta, GA 30334

Water Bottle Filling Stations
Alteration
Results
$188,617 est. value
GA

Cowan's Lake Raw Water Pump Station Improvements
Renovation
Pending Verification
$86,000 CJ est. value
Villa Rica, GA 30180

Little Heiferhorn Sewer Extension
Infrastructure
Bidding
$700,000 CJ est. value
Columbus, GA 31904

On-Call Plumbing Services - Annual Contract
Term Contract
Post-Bid
Lawrenceville, GA

Supplemental Plumbing Services
Alteration
Results
GA

Drainage and Site Renovations for Flint River Community Center
Renovation, Infrastructure
Bidding
$400,000 CJ est. value
Riverdale, GA 30274

Upper Dissolved Oxygen Erosion Repair
Infrastructure
Post-Bid
$1,997,573 CJ est. value
Rincon, GA 31326

Last Updated 07/25/2023 10:51 AM
Project Title

FY 2022 CDBG Sanitary Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) Milledgeville, GA 31061   (Baldwin County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Under this project, the Contractor shall furnish all labor, equipment and materials necessary to construct the proposed sewer system improvements as shown on the construction drawings. More specifically, the work shall consist of +- 5,300 LF of 8" sanitary sewer rehabilitation utilizing CIPP, pipebursting, and dig and replace rehabilitation methods. The work shall also include +- 95 service transfers, the installation of approximately 3,200 LF of 6" and 4" PVC service pipe, +- 170 VF manhole rehabilitation, and +- 30 VF of standard and drop manhole construction. Time allotted for completion of work is 180 consecutive calendar days. Any other questions can be directed to the issuing office, Carter & Sloope, Inc., Canton, GA, 770-479-8782. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days. The Scope of Work as described herein is defined as "utility contracting" in accordance with O.C.G.A. 43-14-2(17) so the Contractor preforming the work must provide proof of a valid license by the State of Georgia as a "Utility Contractor" and must employ a "Utility Manager" certification holder who will have oversight on all the work. The Work includes the furnishing of all necessary machinery, equipment, tools, labor and other construction means, and all materials and equipment required to perform the Work including the placing of the Work into satisfactory operation.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents