Similar Projects
Replace MEP Systems at Lecture Center at SUNY New Paltz
Post-Bid
New Paltz, NY 12561

OSC Cooling Tower Replacement
Term Contract
Post-Bid
Lake Placid, NY 12946

Foley AC-1 Replacement Project
Results
Albany, NY 12207

HVAC Equipment_Service and Preventative Maintenance Contract
Results
Buffalo, NY 14207

New Climate Control System-West Haverstraw Village Community Center Gymnasium
Post-Bid
West Haverstraw, NY 10993

J--HVAC Cleaning of Wards 5C and 9A (VA-19-00018526)
Results
Buffalo, NY NY

HVAC Project
Post-Bid
Mechanicville, NY 12118

Campus Center AC-2 Upgrade
Results
Albany, NY

FAB Heating Upgrade
Post-Bid
New Paltz, NY 12561

J--Batavia Boiler Plant Work (Va-19-00027248)
Results
Batavia, NY 14020

Heating, Ventilating and Air Conditioning (HVAC) Contractors
Term Contract
Post-Bid
Fishkill, NY 461052

Rotary Forge & Cooling Towers
Results
Watervliet, NY 12189

NextGen HVAC Technology Challenge
Term Contract
Post-Bid
Albany, NY 12203

Duct Work Cleaning at Building 25
Results
Watervliet, NY 12189

Maintenance and Repair of HVAC
Post-Bid
NY

Last Updated 12/09/2020 04:46 PM
Project Title

Refrigeration Plant Contract

Physical Address View project details and contacts
City, State (County) Lake Placid, NY 12946   (Essex County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $11,000,000 to $13,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope includes: all labor, tools, equipment, materials, temporary facilities and profit & overhead for a project that includes the removal of existing R-22/R-407F refrigeration system including all refrigeration equipment, related equipment and materials,controls, electrical, HVAC, plumbing and related systems inside the existing refrigeration room, and the removal of the exterior cooling tower. Construction of a new R-513 indirect 1375-ton refrigeration system inside the existing refrigeration room and new exterior cooling tower. Work includes demolition, excavation, concrete, refrigeration equipment, pumps, piping, insulation, refrigerant, HVAC, plumbing, electrical, controls, motor control centers, building modifications, and related items. Project includes all Maintenance and Protection of Traffic and Final Clean-up.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents