Similar Projects
Mill Town Mixed Use
New Construction
Conception
Chattanooga, TN

Villages of Porter Farms Phase 25
New Construction
Conception
Collierville, TN 38017

Wilson Lake Planned Development Phase I
New Construction
Design
Arlington, TN 38002

Saddle Grove Residential Development
New Construction
Design
Smyrna, TN 37167

Residential, Commercial or Mixed-Use Development
New Construction
Bidding
$500,000 est. value
Memphis, TN 38116

1054 Robertson Street Renovations
Renovation
Bidding
$200,000 est. value
Kingsport, TN 37660

THDA Home Grant Housing Rehabilitation
Renovation
Post-Bid
Sneedville, TN

THDA Home Grant Housing Rehabilitation
Renovation
Post-Bid
Elizabethton, TN

Rehabilitation of Owner-Occupied Housing Units Throughout Shelby County
Renovation
Results
Memphis, TN 38134

Rehabilitation of 160 Plum Street
Renovation
Results
Clarksville, TN 37042

Georgetown Planned Development
New Construction
Construction
Collierville, TN 38017

Villages of Porter Farms Phase 21
New Construction - 40,000 SF
Construction
Collierville, TN 38017

Hunter's Point Section 7 Housing Development
New Construction
Pending Verification
Spring Hill, TN 37174

Nexus Residential Phase I North
New Construction
Pending Verification
Gallatin, TN 37066

Harmony Retirement Community
New Construction - 1,840,000 SF
Conception
$10,000,000 CJ est. value
Murfreesboro, TN 37133

Reported 07/12/2022 08:11 AM
Project Title

Miller Farm Cluster and Ashland City Road Lots 1 and 2

Physical Address View project details and contacts
City, State (County) Clarksville, TN 37044   (Montgomery County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected March 2023
Bids Due View project details and contacts
Estimated Value $54,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a residential development in Clarksville, Tennessee. Conceptual plans call for the construction of a 137-unit residential development. Plans call for the construction of 137 single family homes. As of July 11, 2022, this project is in the early planning stages, and received approval from the Clarksville Montgomery County Regional Planning Commission. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to first quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Single-Family Homes, New Construction, 137 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents