Similar Projects
Ditch Maintenance Services for Houston Airport System
Bidding
Houston, TX 77032

Central Campus Detention Basin Repair
Bidding
$500,000 est. value
Pasadena, TX 77502

Northpoint 90 Logistics Center - Public Detention Ponds
Post-Bid
TX

Vince and Little Vince Bayou Harvey Repairs, Harris County, Texas
Post-Bid
$250,000 to $500,000 est. value
TX

Exploration Green Detention Facility Phase 3A
Results
Less than $5,520,000 est. value
Clear Lake City, TX 77058

Harvey Disaster Recovery Repairs at the Clear Creek Bayou, Armand Bayou and Sims Bayou Watersheds
Results
Less than $1,195,000 est. value
TX

Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Bridgeland Jack Road Phase 1
Bidding
TX

FY2020 Local Drainage Program (LDP) Contract 4
Post-Bid
$2,500,000 est. value
Houston, TX 77000

Flood Control Systems Equipment for Harris County
Results
TX

Water, Sanitary, and Drainage Improvements to Serve Morgan’s Landing Section 13
Bidding
TX

Construction of Westwood Subdivision Maple Leaf Box Culverts and Magnolia Creek Ditch Extension
Post-Bid
Houston, TX

Construction of the Water, Sanitary Sewer, and Drainage Facilities to Serve Katy Crossing Section 4
Results
Less than $970,634 est. value
TX

Houston Ship Channel Placement Area 15 Improvements
Post-Bid
$5,000,000 to $10,000,000 est. value
Houston, TX 77002

Natural Stable Channel Design for Pillot Gully Erosion Repairs and Stabilization
Results
Less than $2,628,859 est. value
Houston, TX 77002

Construction of Water, Sanitary, and Drainage Facilities for Winward Section 4
Post-Bid
TX

Last Updated 10/23/2020 09:28 AM
Project Title

Erosion Repairs to the Kothman Gully at the Spring Cypress Road Bridge for Harris County Precinct 4

Physical Address View project details and contacts
City, State (County) Houston, TX 77002   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of erosion repairs to the Kothman Gully at the Spring Cypress Road bridge. The repair work includes, backfilling eroded areas, removing failed 24” riprap from the banks and installing new concrete slope paving, re-installing existing riprap on the channel bottom, adding new riprap on the channel bottom as needed, and removing and replacing two (2) 30” corrugated metal pipes at the Northeast and Northwest bridge corners.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents