Similar Projects
Professional Offices and Warehouse
Renovation
Conception
Merrimack, NH 03054

Pitco Frialator Manufacturing Facility, Warehouse, and Offices
New Construction - 356,224 SF
Conception
Concord, NH 03301

Hudson Logistics Center
New Construction
Design
Hudson, NH 03051

Cross Street Commercial
New Construction - 5,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Salem, NH 03079

Construct Salt Building
New Construction
Bidding
$510,000 est. value
Milan, NH 03588

Club Motorsports Park - Phase II
New Construction - 11,880 SF
Post-Bid
$8,000,000 to $10,000,000 est. value
Tamworth, NH 03886

Salt Shed Storage Building
Post-Bid
New Ipswich, NH

MST Metal Building Addition Design-Build
Addition
Results
Manchester, NH

Salt/Sand Shed
Results
Groveton, NH 03582

Raytheon Expansions
Addition - 4,300 SF
Construction
Pelham, NH

Flatley Mixed Use
New Construction - 100,000 SF
Construction
$1,000,000 to $2,000,000 est. value
Merrimack, NH 03054

Amazon Distribution Center
Build-Out
Pending Verification
Hudson, NH 03051

NV Hudson Industrial Warehouse
Addition - 100,000 SF
Design
Hudson, NH

Public Storage #29163
Renovation
Post-Bid
Nashua, NH

Storage Warehouse Structure
Results
Manchester, NH 03109

Reported 12/15/2021 09:05 AM
Project Title

Storage Shed - Jenny Thompson Pool

Physical Address View project details and contacts
City, State (County) Dover, NH 03820   (Strafford County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide pricing and availability to supply and install a 14’ x 20’ storage shed at the Jenny Thompson Pool located at 150 Portland Avenue, Dover, NH.

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents