Similar Projects
Fire Station 70
New Construction
Conception
$1,580,000 est. value
Phoenix, AZ 85029

Chandler Heights Substation Wellness Center
Renovation
Conception
$495,000 est. value
Chandler, AZ

Fire Station 62
New Construction
Bidding
$6,200,000 est. value
Phoenix, AZ

Mesa Family Advocacy Center MFAC Building Improvements
Renovation
Post-Bid
$1,830,000 to $2,165,000 est. value
Mesa, AZ

Police Dispatch Center Expansion (CMAR)
Renovation - 10,600 SF
Post-Bid
Gilbert, AZ

CMAR - Fire Station No. 2
Results
$58,712 est. value
Queen Creek, AZ 85142

Construction Manager at Risk (CMAR) Fire Station No. 5
Results
$56,490 est. value
Queen Creek, AZ 85142

Police Dispatch Center Expansion (PM/CM)
Renovation - 10,600 SF
Post-Bid
Gilbert, AZ

Construction Manager at Risk for Project 26 Replace Deteriorating Vehicle Training Track
New Construction, Renovation
Results
$19,000,000 est. value
Tempe, AZ 85281

Construction Manager at Risk (CMAR) Services for Fire Station 282 Reconstruction
Renovation
Post-Bid
Chandler, AZ

Fire Station Design Services
New Construction - 19,000 SF
Results
Avondale, AZ 85323

Fire Station 153 Replacement - CMAR
New Construction - 12,400 SF
Post-Bid
$4,500,000 est. value
Glendale, AZ 85306

CMAR and Construction Administration Services of A Fire Station
Results
Avondale, AZ 85323

Permanent Fire Station CMAR
New Construction - 19,000 SF
Results
Avondale, AZ

Maricopa County Sherriff's Office 2 Substation
Renovation - 33,756 SF
Results
Avondale, AZ

Last Updated 07/27/2021 04:31 PM
Project Title

Fire Station No. 8

Physical Address View project details and contacts
City, State (County) Peoria, AZ   (Maricopa County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Seeking Funding, Construction Start Expected third quarter 2025
Bids Due View project details and contacts
Estimated Value $14,251,320
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project provides funding to construct a fire station in the northwest section of the city. The facility would mimic the City's district fire station 4 bay prototype and be programmed at approximately 14,150 square feet. Total capital cost includes administrative fees, engineering and design, furniture, fixtures, land, construction, and equipment. Costs include one traffic signal. This building is priced to include LEED silver level certification consistent with city sustainability objectives. The station will start off housing a fire engine and rescue. Depending on the continued development of the area, the department predicts a ladder truck and ladder tender will need to be added in FY2029.

Details

14,150 SF - Fire/Police Station, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents