Similar Projects
Bridgeway Station Master Development
New Construction - 378,000 SF
Design
$150,000,000 est. value
Mauldin, SC

Bridge Replacement - US 1
New Construction, Infrastructure
Bidding
SC

Rehabilitation - I-95
New Construction, Infrastructure
Bidding

Mungo Park Pedestrian Bridges
Post-Bid
SC 29212

Bridge Replacement - SC 85 (Southern R.R). and S-995
New Construction
Post-Bid
SC

Valencia Road Bridge
Results
$900,000 est. value
Ridgeway, SC 29130

Litchfield Water and Sewer Bridge Crossings Replacement
Results
Less than $242,350 est. value
Pawley's Island, SC 29585

Bridge Replacement - US 301 (Snake Swamp)
New Construction, Infrastructure
Bidding
SC

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Cedarbrook Court Bridge Replacement Project
Results
Columbia, SC 29072

Bridge Replacements - US 301 and S-439 (S Edisto River)
New Construction, Infrastructure
Bidding

Saluda Shoals Front Bridge and Over Look Repair
Post-Bid
$22,000 est. value
Columbia, SC 29212

Motlow Creek Road Bridge Replacement Project
Results
Spartanburg, SC 29304

Bridge D5 Dillon County
New Construction, Term Contract
Post-Bid
SC

Tech Park Bridge Removal and Replacement
Results
Rock Hill, SC 29731

Reported 04/01/2022 12:00 AM
Project Title

Belcher Road Bridge Replacement Project

Physical Address View project details and contacts
City, State (County) SC   (Spartanburg County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work is for the construction of the Belcher Road Bridge Replacement Project. The construction of a 100-foot long single span bridge on Belcher Road over Lawsons Fork Creek. Included shall be all beams, foundations, piles, end bents, retaining walls, traffic control, clearing, grubbing, grading, erosion control, seeding, stabilization and other appurtenances necessary for the construction of a new bridge and road project. The new bridge will be about 5 feet horizontally downstream from the existing bridge and about 9 feet higher in elevation than the existing bridge. The project will include approximately 1150 feet of new road construction with approximately 12,000 cubic yards of borrow to raise the new road and new bridge elevation to meet new flood elevation standards.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents