Similar Projects
Last Updated | 02/23/2023 03:32 PM |
Project Title | 2023 Bituminous Patching Project |
Physical Address | View project details and contacts |
City, State (County) | Stevens Point, WI 54481 (Portage County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $118,315 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Est. Completion Date: Nov. 17, 2023 Site Directions: Location Vary Project Category Code: Bituminous Patching/Coating/Surfacing Description: Bituminous Patching shall consist of repairing excavations in existing streets throughout the City of Stevens Point. The Contractor shall be responsible for signage and barricading of the patches from the time base course is removed until patch is complete; general cleanup including sweeping of the street after base is removed and after bituminous is placed is also required. Traffic control shall be in accordance with the Manual of Uniform Traffic Control Devices (MUTCD). |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |