Similar Projects
Power and Small Auto Transformer
Bidding
Austin, TX

Del Rio Lighting
Bidding
Austin, TX 78773

Photovoltaic Power Systems and Component
Term Contract
Post-Bid
Austin, TX 78759

Campus Switch Upgrades
Post-Bid
Austin, TX 78703

Generator Hydrogen Fast Purge Systems, Sand Hill
Results
Del Valle, TX 78617

Substation Control Switches and Lock-Out Relays
Results
Less than $3,500,000 est. value
Austin, TX 78767

Electrical Services
Bidding
Austin, TX 78701

District UPS Replacement
Post-Bid
Pflugerville, TX 78660

Generator Inspection Services
Results
Less than $19,792 est. value
Austin, TX 78701

Generator Repair
Bidding
Austin, TX 78701

Distribution Line Clearance, Street and Nightwatchman Lights
Term Contract
Post-Bid
Austin, TX 78767

Generator Replacement
Results
Less than $108,124 est. value
Austin, TX 78756

Street Light LED
Post-Bid
Austin, TX 78767

Summit T161 Transmission Line Relocate
Results
Less than $366,716 est. value
Austin, TX 78744

Rosedale School BP2 - Steel, Concrete, Electric, Elevators
- 75,000 SF
Post-Bid
Austin, TX 78757

Last Updated 08/14/2020 07:47 AM
Project Title

Austin Energy's Domain District Cooling Plant Switchgear Replacement

Physical Address View project details and contacts
City, State (County) Austin, TX 78758   (Travis County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,096,824
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor to replace the current switchgear at the Domain District Cooling Plant. The work consists of the furnish, install, and commissioning of (2) two new M-T-M, 12.47kV, 3200A double-ended secondary unit substations each with MV interrupter switches, dry-type transformers rated at 2 MVA AA / 2.67 MVA FA, and a secondary distribution switchgear section. Installation of the secondary unit new substations shall occur within second level of the plant electrical room (mezzanine). The work also consists of demolition and removal of (4) existing secondary unit substations with MV interrupter switches, dry-type transformers, and distribution switchgear sections (CU 9A, CU 9B, CU 10A, and CU 10B), along with the demolition and removal of associated housekeeping pads.

Details

Division 26 - Electrical, Medium-Voltage Switchgear, Low-Voltage Switchgear.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents