Similar Projects
Weatherization at the Highway Garage
Bidding
Templeton, MA 01468

Entrance Alterations Grafton Memorial Municipal Center
Bidding
$73,000 est. value
Grafton, MA 01519

Removal and Construction of Stonewall
Post-Bid
Charlton, MA

Mercantile Center Facade Washing and Lighting
Post-Bid
Worcester, MA

Facade at 44 Hamilton Street
Results
Southbridge, MA

Exterior Renovations - South Worcester Neighborhood Center/DPW and P
Results
$214,000 est. value
Worcester, MA 01608

Phase II Exterior Recreation Yards at Souza Baranowski Correctional Center
Post-Bid
Less than $800,000 est. value
Lancaster, MA

Public Library Building Envelope Restoration - General Bids
Results
Less than $98,000 est. value
Oxford, MA 01540

Limestone Caps and Bands Repair
Post-Bid
Less than $12,000 est. value
Worcester, MA 01606

Oxford Public Library Building Envelope Restoration - Filed Sub Bids
Results
$140,000 est. value
Oxford, MA 01540

Sutton Town Hall Cupola Repair Project
Post-Bid
Less than $25,000 est. value
Sutton, MA 01590

Town Hall Ramp and Stairs
Results
Less than $45,000 est. value
Paxton, MA 01612

Facade Improvements to Single-Story Commercial Building
Post-Bid
Clinton, MA 01510

Parapet Cap Replacement - DCU Center / EAM
Results
Less than $50,000 est. value
Worcester, MA 01608

Front Entry Modernization
Results
Less than $34,300 est. value
Northborough, MA

Reported 01/21/2021 08:51 AM
Project Title

Senior Center Outdoor Space Construction

Physical Address View project details and contacts
City, State (County) Hubbardston, MA 01452   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value $45,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

•Supply and install ADA compliant decking attached to the current Senior Center structure •Supply and install full or partial roofing for the outdoor space •Supplying and install all ramps/stairs needed to connect the existing structures to the new outdoor space •Complete the project by October 31, 2020

Details

Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents