Similar Projects
Ida Storm Drainage Repairs for County Route 601
Infrastructure
Bidding
$150,000 to $200,000 est. value
NJ

Block 650, Lot 32 Detention Basin and Storm Sewer Project
Infrastructure
Bidding
$126,000 est. value
East Orange, NJ

Maintenance and Repair: Sewer and Storm Drains (Overflow Regulators)
Post-Bid
Newark, NJ

Red Hawk Deck Sewer Storm Repair at Montclair State University
Infrastructure
Post-Bid
Little Falls, NJ

Water Main, Sanitary Sewer and Storm Water Facility Repairs
Results
Fair Lawn, NJ 07410

Storm Drainage Improvement Project
Results
West Deptford, NJ 08086

Improvements to South 4th Avenue, Johnson Street, and Montgomery Street
Infrastructure
Bidding
$500,000 est. value
Highland Park, NJ 08904

Storm Drain Inlet Repairs
Term Contract
Post-Bid
Allendale, NJ

Emergency Repair of Sewers
Results
Newark, NJ 07102

Stormwater Improvements on C.R. 623 Clems Run Road Between U.S. 322/C.R. 536 Mullica Hill Road and C.R. 619 Whig Lane
Infrastructure
Bidding
$145,000 est. value
Woodbury, NJ

Upper Sarepta Road/Mutton Hill Road Stormwater Structure Repairs
Infrastructure
Post-Bid
Belvidere, NJ

Storm Sewer Inlets and Manholes
Term Contract
Results
Whippany, NJ

Catch Basins and Manhole Castings Contract
Term Contract
Post-Bid
Randolph, NJ

Dellwood Lane Detention Basin Retrofit
Results
Franklin Township, NJ 08873

Emergency Water Main and/or Storm and Sanitary Sewer Repairs
Infrastructure
Post-Bid
Oradell, NJ

Reported 06/17/2022 12:00 AM
Project Title

Stormwater Pond Improvements at the Middlesex County Landfill

Physical Address View project details and contacts
City, State (County) East Brunswick, NJ 08816   (Middlesex County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The improvements include the demolition of existing facilities and the installation of new submersible pumps, pump guide rail systems, concrete pads, PVC pressure piping, fittings and valves, pipe supports, pump screens, radar and float system, pump control panels, termination boxes, main distribution panels, electrical conduits, wiring and all other work in accordance with the Contract Documents. Additionally, the project scope also includes the construction of two (2) contact stormwater swales with associated piping and accessories, as well as the restoration Pond 1 and portions of Pond 4 in accordance with the Contract Documents.

Details

Division 03 - Concrete, Precast Concrete.
Division 22 - Plumbing, Facility Sanitary Sewerage, Packaged, Submersible Sewerage Pump Units.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents