Similar Projects
Sewer Improvements - County of Lake
Infrastructure
Conception
$25,000,000 est. value
Crown Point, IN

Liberty Park Pipe Lining, Crown Point
Infrastructure
Design
$5,000,000 est. value
Crown Point, IN

Independence Hill Conservancy District Sanitary Sewer Lateral Pipelining, Merrillville
Infrastructure
Design
$5,000,000 est. value
Merrillville, IN

Closed Gary Landfill Gas Collection and Control System Improvements
Renovation
Bidding
$2,000,000 CJ est. value
Gary, IN 46406

Whiting Center Street 119th Street to Grenchik Lane
Infrastructure
Bidding
$470,000 CJ est. value
Whiting, IN 46394

Calumet Avenue Water Distribution System Improvements - Contract -3
Post-Bid
Dyer, IN 46311

2021 Roadway and Water Main Improvements - Crestwood, Bluebird, Elliott, Timrick
Post-Bid
Munster, IN 46321

Hobart Community Pool Site Improvements-Phase 2
Results
Hobart, IN 46342

Abandoned Coal Mine Restoration
Results
$150,000 est. value

2023 Dyer Street Reconstruction Projects
Infrastructure
Bidding
$300,000 CJ est. value
Dyer, IN 46311

State Road 2 Water Main Replacement
Infrastructure
Post-Bid
Lowell, IN

Hanover Central High School Site Improvements
Results
Cedar Lake, IN 46303

Marcella Road Storm Sewer Project
Infrastructure
Bidding
$200,000 CJ est. value
Merrillville, IN 46410

3500 Block of Jewett Avenue Water Main Replacement and Street Improvement
Infrastructure
Post-Bid
Highland, IN 46322

Columbus Drive Utility Relocation
Results
East Chicago, IN 46312

Last Updated 07/25/2022 12:39 AM
Project Title

Sauerman Woods Drainage Improvements - Phase 1

Physical Address View project details and contacts
City, State (County) Crown Point, IN 46307   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation of a 3-acre retention pond for storm water storage consisting of approximately 80,000 cys. of excavation. A new 24-36 storm sewer outfall pipe will extend to the NE approximately 900 LF from the retention pond to the existing ditch. The existing storm sewer pipes coming into the retention pond on the south side will be modified and will discharge into a forebay adjacent to the pond. The existing ditch on the south side of the pond will be partially filled with a new 24 outfall located on the SE side of the pond. Demolition work will consist of removal of the existing pool, pool house and related appurtenances. Additional demo work will include removal of parking areas, basketball/volleyball courts and drives. There will be approximately 2 acres of clearing. Bidders will be required to provide Bid security according to the requirements in Instructions to Bidders. Submit your Bid on the Bid Form provided in the Bid Documents. Bids shall include all information requested by Indiana Form 96 (Revised 2013) included with the Bid Documents. As required by Bid Form 96, Section III, the Bidder shall submit a financial statement. The Owner may make such investigations as deemed necessary to determine the ability of the Bidder to perform the work and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Agreement and to complete the work when and as contemplated therein. Each Bidder is responsible for inspecting the Project site(s) and for reading and being thoroughly familiar with the Bid Documents. The failure or omission of any Bidder to do any of the foregoing shall in no way relieve any Bidder from any obligation with respect to its Bid. Your Bid will be required to be submitted under a condition of irrevocability for a period of 45 days after submission. Questions will be due in writing to the engineer, Bryan Hood, PE (bhood@structurepoint.com) and Sam Sutter (ssutter@structurepoint.com) by 5:00 PM on June 29, 2022.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Public Storm Utility Drainage Piping, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents