Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Design
Spokane, WA 99218

Funk and Ballard Alley Road Water Main Replacement
Infrastructure
Bidding
$705,749 est. value
WA

Longview and Kinder Reconstruction
Infrastructure
Bidding
$2,750,000 to $2,900,000 est. value
Moses Lake, WA 98837

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

Water Meter Changeout
Infrastructure
Results
WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

Reservoir 2 and Water System Improvements
Infrastructure
Bidding
$2,800,000 to $3,200,000 est. value
Bridgeport, WA

Sedgwick Road Watermain Relocation
Infrastructure
Post-Bid
Port Orchard, WA

Louis Thompson Tightline
New Construction, Infrastructure
Results
$5,800,000 est. value
Sammamish, WA 98074

Fire Hydrants and Storz Adapters
Infrastructure
Bidding
Vancouver, WA

SR 224 Van Giesen Improvement Phase One
Infrastructure
Post-Bid
West Richland, WA

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

East Ford Avenue and West Date Street Water Main Replacements
Infrastructure
Bidding
$250,000 to $300,000 est. value
Connell, WA

Last Updated 04/06/2022 05:08 PM
Project Title

SR900 PRV Improvements Project

Physical Address View project details and contacts
City, State (County) Issaquah, WA 98027   (King County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $450,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be performed includes replacement of equipment and PRVs and installation of an above-grade enclosure at the SR900 PRV site at the southeast corner of Newport Way NW and SR900.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents