Similar Projects
Wallace Run Waterline Replacement - General Construction
Infrastructure
Bidding
$45,000 est. value
Milesburg, PA

Penn Hills PRV Replacement Project
Infrastructure
Bidding
$75,000 est. value
State College, PA

Shiloh Pump Station Materials
Post-Bid
State College, PA 16801

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

North Main Street Waterline Replacement
Results
$100,000 est. value
Bellefonte, PA 16823

East Halls Pump Station Upgrades
New Construction, Demolition
Construction
$1,980,000 est. value
University Park, PA

Construction of the Beneficial Reuse Waterline Extension
Results
State College, PA 16801

East College Avenue Waterline Replacement Project
Results
State College, PA 16801

Sycamore Street and Park Avenue Meter Vaults
Results
$175,000 est. value
Snow Shoe, PA 16874

Legion Lane Waterline Replacement
Results
Less than $575,000 est. value
State College, PA

Piersol Lane Waterline Replacement
Results
Less than $575,000 est. value
State College, PA

Logan Avenue Waterline Replacement
Results
Less than $575,000 est. value
State College, PA

East Locust Street Waterline Replacement (General/Excavation)
Results
Centre Hall, PA 16828

Pike Street Water Main Relocation and Extension
Infrastructure
Results
Lemont, State College, PA

Scott Road Pump Station and Forcemain Upgrade Engineer's - Electrical Construction
Infrastructure, Alteration
Results
$25,000 est. value
State College, PA 16801

Last Updated 08/12/2021 07:48 AM
Project Title

Scott Road Pump Station and Forcemain Upgrade - General Construction

Physical Address View project details and contacts
City, State (County) State College, PA 16801   (Centre County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a new duplex submersible wastewater pump station adjacent to the existing pump station facilities, as well as construction of approximately 860 L.F. of forcemain piping and appurtenances. The Project also includes the construction of new gravity sewer site piping. Engineer Estimate Cost General Construction - $340,000-$440,000 Electrical Construction - $125,000-$175,000

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents