Similar Projects
2022 Mechanical Upgrades
Renovation
Bidding
Cicero, IL 60804

2022 Summer Work
Renovation
Bidding
Wheeling, IL

North High School Master Facility Plan
Post-Bid
Downers Grove, IL 60515

2021 Summer Renovations at West Oak Campus and Diamond Lake School
Renovation
Post-Bid
Mundelein, IL 60060

Gym 1 Renovations and Think Lab at Lane Tech HS
Renovation
Results
Chicago, IL 60618

Cloverdale ES New Innovative Center
Renovation
Results
Carol Stream, IL 60188

2022 and 2023 Referendum Work - Remodeling at Multiple Sites - Intermediates Attea
Renovation, Infrastructure
Bidding
Glenview, IL

2021 Washroom and Life Safety Work
Renovation
Post-Bid
Palatine, IL 60067

Old Orchard Junior High School - Corridor Code Compliance - BP #1 - General Trades
Results
Skokie, IL 60076

CPS Collins HS MEP
Renovation
Bidding
$2,500,000 est. value
Chicago, IL 60623

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

East Building Addition Phase II Project Fitness Addition
Addition
Results
Half Day, Lincolnshire, IL 60069

CPS Addams ES - Ariel Academy MEP
Renovation
Bidding
$8,000,000 est. value
Chicago, IL 60653

East Building Addition Phase II
Addition
Post-Bid
Lincolnshire, IL 60069

Interior Renovations
Results
Less than $120,000 est. value
Akin, IL

Last Updated 02/09/2022 04:37 PM
Project Title

High School Additions and Improvements

Physical Address View project details and contacts
City, State (County) Saint Joseph, IL 61873   (Champaign County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of: A new weight room addition with connecting corridor on the west side of the existing athletic wing. The project will also be remodeling the existing weight room and turning it into a full-time wrestling room. The project includes remodeling the existing 1926 gym / theater space and turning it into a fulltime theater with a new balcony and all new M/E/P systems within the space. The adjacent corridors of the original building will also be remodeled as a part of this project. Fire Protection work will also be a part of all areas of this project. The owner will have their owner AV contractor for the procurement and installation of AV equipment. This project provides the infrastructure / pathways for the AV systems. Lastly, there will be alternates to replace the existing mechanical system, lighting, and ceilings of the 1926 classroom wings that surround the south side of the theater as well as some areas of the 1962 addition, which is just to the east and northeast of the theater space. Other alternates are in the project as well.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents