Similar Projects
Last Updated | 03/03/2023 04:34 PM |
Project Title | UAB Highlands 2nd Floor Envelope Building Repair |
Physical Address | View project details and contacts |
City, State (County) | Birmingham, AL 35205 (Jefferson County) |
Category(s) | Education, Medical |
Sub-Category(s) | College/University, Hospital |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $700,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of exterior demolition and repair of the existing northwest corner of the building envelope to provide a watertight building envelope system including but not limited to concrete patching, masonry, expansion joint, window glazing, and EIFS work. The work will be performed under a single Prime General Contractor who will coordinate the work of this project. Particular and specific care will be required to limit disturbances, coordinate shutdowns, and follow strict Infection Controls and Interim Life Safety Measures (ICRA/ILSM) requirements for the protection of patients, family, and staff. The Prime General Contractors seeking to be prequalified will require experience with similar size and type projects performed in and adjacent to an operating hospital environment and with the implementation and maintenance of infection control measures, interim life safety measures, coordinating shutdowns, and maintaining a clean and organized job site in and adjacent to an operating hospital. The General Contractor must have experience with representative projects as a General Contractor (not as a Construction Manager, Program Manager, etc.) Prime contractor bidders interested in submitting a proposal must apply for prequalification and must be licensed under the Provision of Title 34, Chapter 8, and Code of Alabama, 1975. A copy of current Alabama Contractors license is to be included in pre-qualification submittal. Pre-qualification Requirements Information Package may be obtained from the Architect upon letterhead request. The pre-qualification procedure is intended to identify responsible and competent prime contractor bidders relative to the requirements of the Project. Each prospective prime contractor bidder will be notified of the results of the pre-qualification, on or about Friday, December 19, 2022 by 5:00 PM Central Time. A certified check or bid bond payable to the University of Alabama at Birmingham in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000 must accompany the bidder's proposal. Performance and Statutory Labor and Material Payment Bonds will be required at the signing of the Contract. Bids must be submitted on proposal forms or copies thereof furnished by the Architect. No bid may be withdrawn after the scheduled closing time for receipt of bids for a period of ninety (90) days. The Owner reserves the right to reject bids if such action is determined to be in the best interest of the Owner. The Owner reserves the right to revoke pre-qualification of any bidder in accordance with Section 39-2- 12, Code of Alabama, 1975, as amended in 1997 (by Act 97-225). Fire Alarm Work In accordance with Title 34, Chapter 33A, of the Code of Alabama 1975, bidders for fire alarm work of this project, if any, must include with their bid, evidence of licensure as required by the act, by including with the bid submittal, a valid State Fire Marshal's permit. The construction budget is anticipated to be between $500,000 and $700,000. The Owner reserves the right to waive technical errors in applications, or abandon the pre-qualification process, should the interests of the Owner appear to be promoted thereby. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The time and date of the Bid Opening will be postponed. The revised Bid Date is Tuesday February 7, 2023 at 2:00 PM Central Time at the University of Alabama at Birmingham, UAB Hospital Planning, 2020 University Blvd., Birmingham, Alabama 35294.* |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |