Similar Projects
The Homes at Avon Park
Renovation
Conception
Hartford, CT

West Street Mixed Use
New Construction - 22,000 SF
Conception
Southington, CT 06489

West Street Hotel
New Construction, Infrastructure - 22,620 SF
Design
$6,800,000 CJ est. value
Southington, CT 06479

Shuttle Meadow Country Club Condos
New Construction
Design
Berlin, CT

Terminal A Viaduct Repairs Bradley International Airport
Infrastructure
Bidding
$850,000 CJ est. value
Windsor Locks, CT 06096

Veterans Terrace Phase 2
Demolition
Post-Bid
$10,900,000 est. value
East Hartford, CT 06108

Downtown Traffic Signal Improvements - Phase I
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Hartford, CT 06103

Arrowhead Redevelopment Project
Renovation
Results
Hartford, CT 06103

Renovations and Improvements at Casey Field and E.G. Stocks Playground
Infrastructure
Results
$516,500 CJ est. value
Bristol, CT 06010

HOH Boiler House
Renovation - 6,277 SF
Construction
$8,000,000 est. value
Hartford, CT 06100

The Elms
Renovation
Construction
$6,454,653 est. value
West Hartford, CT 06107

Mastrianni Place Commercial Buildings
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Southington, CT 06489

East Granby Meadows
Renovation
Pending Verification
East Granby, CT

Lawton Road Residential Development
New Construction
Conception
Canton, CT

Main Street Apartments
New Construction, Build-Out, Demolition - 5,600 SF
Design
$14,000,000 est. value
New Britain, CT 06051

Last Updated 02/13/2023 02:09 PM
Project Title

West Hartford Fellowship Housing Campus and New Construction of WHFH Phase I Buildings

Physical Address View project details and contacts
City, State (County) West Hartford, CT 06117   (Hartford County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $28,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope consists of but is not limited to renovation and construction of two 3-story buildings, 65 units, plus a connector building, partial demolition of existing community building and new façade for same, and associated site work. As of January 30, 2023, a construction manager has been selected. All questions must be submitted in written form and directed to the estimators: Erick Facchini-efacchini@haynesct.com / Nicholas Pappas - npappas@haynesct.com Haynes Construction is an AA/EOE Employer. HCC encourages participation to all Veterans, S/W/MBE Certified Businesses. National Green Building Standards (Emerald) apply to this project. This project is tax exempt. Construction is anticipated to begin May 1, 2023.

Details

3 Stories Above Grade, 25,612 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents