Similar Projects
WWTP Consolidation Project Phase III
New Construction
Conception
$4,000,000 est. value
Pasadena, TX 77505

69th Street Wastewater Treatment Plant - R-000509 - City of Houston
Renovation
Conception
$22,740,000 est. value
Houston, TX 77011

New Multi-Use Solid Waste Department Facility
New Construction
Design
Houston, TX 77026

Centrifuges 69th Street Purchase and Installation
Alteration
Bidding
$400,000 est. value
Houston, TX 77282

HPW - Southeast Wastewater Treatment Plant Improvements/Expansion - Package 1
Renovation
Bidding
$34,500,000 est. value
Houston, TX

White Oak WWTP Catwalk Grating Replacement
Renovation
Post-Bid
TX 77282

On-Site Sludge Conveyor System Belt Modification Service
Renovation
Post-Bid
Houston, TX

Ulitmate Wastewater Treatment Plant Phase 3 Expansion - 0.72 MGD - Construction
Results
$2,100,000 est. value
Houston, TX 77056

Construction of 2020 Wastewater Treatment Plant Improvements
Results
$1,124,200 est. value
Spring, TX 77389

New 0.2875 MGD ADF Wastewater Treatment Plant
New Construction
Construction
$2,553,943 est. value
Houston, TX

Wastewater Plant Phase One
New Construction
Construction
TX

Wastewater Treatment Plant Phase 2 (0.5 MGD) and Lift Station No. 1 Phase 2 to Serve Brazoria Fort Bend Counties Municipal Utility District No. 3
New Construction
Bidding
$3,000,000 est. value
Houston, TX

Wastewater Treatment Plant Improvements
Renovation
Post-Bid
TX

Replacement of Grit Classifier at Wastewater Treatment Plant
Results
Less than $226,000 est. value
Houston, TX 77024

Wastewater Treatment Plant Expansion
New Construction
Post-Bid
TX

Last Updated 07/04/2022 12:44 AM
Project Title

Waste Water Treatment Plant Reuse System Bypass

Physical Address View project details and contacts
City, State (County) Houston, TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor to furnish and install yard piping, fittings, valves, and appurtenances to complete a bypass for the reuse filtration system; in accordance with plan and specifications. Contractor shall furnish a bypass pumping plan, all labor, equipment, and appurtenance for construction of reuse system bypass

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents