Similar Projects
North City Hillside Projects
New Construction - 1,700,000 SF
Conception
$400,000,000 est. value
San Marcos, CA 92069

C1DA--VISN 21 Master Planning/Study A/E IDIQ
New Construction, Term Contract
Design
$50,000,000 to $100,000,000 est. value

Indefinite Delivery Indefinite Quantity Architect-engineering Services for Preparation of Us Navy and Marine Corps Environmental Planning Documents Primarily
Renovation, Infrastructure
Design
$50,000 to $3,000,000 est. value
San Diego, CA

RFQ - Architect - Engineer Services for Civil Engineering
Term Contract
Bidding
$20,000,000 CJ est. value
San Diego, CA 92132

Affordable Housing Construction, Acquisition and Rehabilitation
Renovation
Bidding
San Diego, CA 92104

On-call Plumbing Services
Term Contract
Sub-Bidding
San Diego, CA 92101

Engineering, Planning and Development
Post-Bid

Indefinite-Delivery Indefinite-Quantity Architect-Engineer Contract; Mechanical, Electrical, Plumbing And Fire Protection; Navfac Sw
Term Contract
Post-Bid
$5,000 to $40,000,000 est. value

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

Quieter Home Program Phase 11 Group 11
Renovation
Results
$2,032,539 est. value
San Diego, CA

Riverwalk Golf Club
New Construction, Renovation, Infrastructure - 1,150,000 SF
Pending Verification
$2,500,000,000 CJ est. value
San Diego, CA 92108

RFQ - As-Needed Surveying Services
Term Contract
Bidding
$2,500,000 CJ est. value
National City, CA 91950

Unrestricted Architect-Engineering Airfield Paving Design MATOC
Term Contract
Post-Bid
Less than $30,000,000 est. value

Quieter Home Program Phase 12 Group 2
Renovation
Results
$1,159,711 CJ est. value
San Diego, CA 92101

RFQ - As-Needed Landscape Architecture Services
Term Contract
Bidding
National City, CA 91950

Last Updated 08/16/2022 07:31 PM
Project Title

RFP Design - Designs for the Permit-Ready Accessory Dwelling Unit

Physical Address View project details and contacts
City, State (County) Chula Vista, CA 91910   (San Diego County)
Category(s) Professional Services, Residential
Sub-Category(s) Architectural, Single-Family Homes
Contracting Method Competitive Bids
Project Status Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Pre-Bid Meeting No Online Q&A Online Q&A Yes Q&A Deadline 08/18/2022 3:00 PM (PDT) The City of Chula Vista ("City") is searching for qualified consultants or teams for the design and preparation of permit-ready ADU building plan sets for a new Chula Vista ADU Assistance program. The City is inviting interested consultants to submit a proposal to perform the plan design services described in this Request for Proposal (RFP). The City desires to develop a collection of potential ADU building plan sets for an expedited review program. This program will include options for up to seven unit types and sizes. The method of Contractor Selection has not been Determined at this time. As of August 16, 2022, the due date and time has been confirmed with the owner.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents