Project Title | Janesville Public Library |
Physical Address | View project details and contacts |
City, State (County) | Janesville, IA 50647 (Bremer County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Library - Public, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $399,400 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Notice is hereby given that the Owner, 227 Main Street, Janesville, IA invites contractors to submit bids for this project and that a public hearing will be held on the project. Bid Type: One lump sum contract will be awarded at the appointed time and place. All bids shall be on the forms provided in the specifications for project. The provided forms of proposal shall be submitted at the time required for bids. Each bid shall be accompanied by a bid bond, certified check, cashier's check, or credit union certified share draft, in a separate sealed envelope in an amount equal to five percent (5%) of the total amount of the bid. If bid bond is submitted, it must be on an approved AIA bid bond form. The certified check or cashier's check shall be drawn on a bank in Iowa or a bank chartered under the laws of the United States of America; certified share draft shall be drawn on a credit union chartered under the laws of the United States. Bid security should be made payable to the Owner as security that if awarded a contract the bidder will enter into a contract at the prices bid and furnish the required Contractor's Bonds, Certificate of Insurance, and other materials as may be required in the contract documents. The certified check, cashier's check, or certified share draft may be cashed, or the Bid Bond forfeited, and the proceeds retained as liquidated damages if the Bidder fails to execute a contract and file acceptable Certificate of Insurance within ten (10) days after the acceptance of the proposal by the Owner. No bidder may withdraw a proposal within thirty (30) days after the date set for opening bids. The successful bidder shall be required to furnish a Contractor's Performance and Labor and Material Payment Bond on an approved AIA form in an amount equal to one hundred percent (100%) of the contract price. The bonds are to be issued by responsible surety, approved by the Owner, and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for and of all materials and protect and save harmless the Owner from all claims and damages of any kind caused by the operation of the Contractor, and shall guarantee the work contracted for a period of one (1) year from the date of final acceptance of the improvements by the Owner. Sales Tax: The said project is a tax-exempt project. The Owner will issue exemption certificates from the Iowa Department of Revenue, as specified in the 701 Iowa Administrative Code, Chapter 19, Rule 19.12. These certificates shall be used by the successful bidder when purchasing materials or the completion of the project. Award of Contract: Notice is hereby given that the Owner will meet at the location and time designated above at which time and place the Owner will consider bids for said construction. Progress Payments: Payment to the Contractor will be made in monthly estimates and one final payment. Monthly estimates will be equivalent to ninety-five percent (95%) of the contract value of the work completed during the preceding calendar month. Such payments will in no way be construed as an act of acceptance for any of the work partially or totally completed. Final Payment: Final payment to Contractor will be made no earlier than forty-five (45) days from and after final acceptance of work by the Owner, subject to the contract conditions and in accordance with the provisions of Iowa Code chapters 26 and 573. Project Construction Schedule: The work under the contract shall commence on or before the date specified in the written 'Notice of Proceed' or if lieu of the notice to proceed, the execution of the contract for construction and shall be Substantially Completed on or before July 31, 2023, and fully completed and ready for acceptance no later than August 15, 2023. Iowa Preference: By virtue of statutory authority, preference will be given to products and provisions grown and produced within the State of Iowa and to Iowa domestic labor. The Owner hereby reserves the right to reject any or all bids and to waive informalities and irregularities and to accept the lowest responsive and responsible bid. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |